Lake Oroville SRA

 

All launch ramps at Lake Oroville SRA are subject to change due to water level.
See the most current Lake Level Status

For confirmation of the current ramp status contact the
Northern Buttes District Office at (530) 538-2200.


Standard Launch Ramps:

LOCATION STATUS OPERATING ELEVATIONS (FULL LAKE ELEVATION – 900’)
 Bidwell Canyon Stage 1 is currently OPEN and accessible to launch vessels.
  • STAGE 1 -  900’ TO 740
  • STAGE 2 -  740’ TO 705
  • STAGE 3 -  705’ TO 665
 Spillway STAGE 2 is currently OPEN and accessible to launch vessels.
  • STAGE 1 - 900’ TO 821’
  • STAGE 2 – 821’ TO 734’
  • STAGE 3 – 734’ TO 700’
 Loafer Creek Loafer Point Stage 2 Ramp. (Old Loafer Creek Ramp is closed).
  • STAGE 1 (OLD)- 900’ TO 780’ 
  • STAGE 1 (NEW)- 900’ TO 804’
  • STAGE 2 (NEW)– 804’ TO  680’ 
 Lime Saddle OPEN
  • STAGE 1 - 900’ TO 707’
 Enterprise  CLOSED
  • STAGE 1 - 900’ TO 842’


Forebay Launch Ramps:

 North Forebay 1  OPEN  
 North Forebay 2  OPEN  
 South Forebay  OPEN  


Car Top Ramps:

 Dark Canyon  CLOSED  Closed - Until county road and ramp can be repaired.
 Foreman Creek  OPEN
  • STAGE 1 -  900’ TO 730
 Nelson Bar CLOSED
  • STAGE 1 -  900’ TO 854
 Stringtown CLOSED
  • STAGE 1 -  900’ TO 869
 Vinton Gulch  CLOSED
  • STAGE 1 - 900’ TO 880’