Lake Oroville SRA

 

All launch ramps at Lake Oroville SRA are subject to change due to water level.
See the most current Lake Level Status

For confirmation of the current ramp status contact the
Northern Buttes District Office at (530) 538-2200.


Launching Locations and Hours

Boat ramps at Lake Oroville will no longer be open 24/7. The launching of inspected and sealed watercraft are limited to the following locations and hours. Vessels and vehicles using the ramp must exit by ramp closing time or they will be locked into the facility overnight. Please plan ahead.

Prior to launching, DWR’s seal checkers will remove your vessel’s seal. The seal should not be removed by the vessel owner.  

When a vessel is leaving the Oroville facilities, staff at designated launch ramps will offer to re-seal all departing watercraft with a blue Oroville seal. During the next visit, sealed Oroville vessels can proceed directly to the ramp to launch where a seal checker will remove the seal. Reinspection is not required as long as the seal is not broken. 

Re-entry seals will only be offered to departing vessels during ramp hours.

Standard Launch Ramps:

LOCATION STATUS OPERATING ELEVATIONS (FULL LAKE ELEVATION – 900’)

 Bidwell Canyon 

 Ramp Hours

Monday-Thursday 7:30 a.m. to 6:30 p.m.

Friday-Sunday 7:30 a.m. to 8 p.m.

STAGE 1 is currently OPEN and accessible to launch vessels.
  • STAGE 1 -  900’ TO 740
  • STAGE 2 -  740’ TO 705
  • STAGE 3 -  705’ TO 665

 Spillway

 Ramp Hours - Daily from 7:30 a.m. to 6:30 p.m.

STAGE 2 is currently OPEN and accessible to launch vessels.
  • STAGE 1 - 900’ TO 821’
  • STAGE 2 – 821’ TO 734’
  • STAGE 3 – 734’ TO 700’

 Loafer Creek/Loafer Point

 Ramp Hours- Daily from 5 a.m. to 6:30p.m.

 Loafer Point STAGE 2 is currently OPEN and accessible to Launch vessels. (Stage 1 is CLOSED)
  • STAGE 1 (OLD)- 900’ TO 780’ 
  • STAGE 1 (NEW)- 900’ TO 804’
  • STAGE 2 (NEW)– 804’ TO  680’ 

 Lime Saddle

 Ramp Hours

Monday-Thursday 5 a.m. to 6:30 p.m.

Friday-Sunday 5 a.m. to 8 p.m.

OPEN
  • STAGE 1 - 900’ TO 707’
 Enterprise  CLOSED
  • STAGE 1 - 900’ TO 842’


Forebay Launch Ramps:

 North Forebay 1

  Ramp Hours - 8:00 a.m. to sunset

 OPEN (Non-motorized vessels only)  

 North Forebay 2

 Ramp Hours - 8:00 a.m. to sunset

 OPEN (Non- motorized vessels only)  

 South Forebay

  Park Hours - 8:00 a.m. to sunset

 CLOSED  


Car Top Ramps:

 Dark Canyon  CLOSED  Closed - Until county road and ramp can be repaired.
 Foreman Creek  CLOSED
  • STAGE 1 -  900’ TO 730
 Nelson Bar CLOSED
  • STAGE 1 -  900’ TO 854
 Stringtown CLOSED
  • STAGE 1 -  900’ TO 869
 Vinton Gulch   CLOSED
  • STAGE 1 - 900’ TO 880’