Skip to main content
CNRA Logo

Proposition 4 Allocation Balance Report

as of February 27, 2026

Public Resources Code 90000

Prop 4 ABR Header
Chapter Subsection Department Program Net
Allocation*
Enacted
Appropriations
Proposed Budget
Year
Outyear
Commitments
Balance
Ch. 2 91011 State Water Resources Control Board: Improve Water Quality or provide Clean, Safe, Reliable Drinking Water $578,613,000 $183,167,000 $160,167,000 $9,711,000 $225,568,000
Ch. 2 91011(a)(8) State Water Resources Control Board: Tribal Water Infrastructure Projects $26,812,000 $11,155,000 $12,870,000 $787,000 $2,000,000
Ch. 2 91012(a) and (b) Department of Water Resources: Groundwater Storage or Banking (Sustainable Groundwater Management Act) $191,677,000 $15,000,000 $9,750,000 $5,250,000 $161,677,000
Ch. 2 91012(a) and (c) Department of Water Resources: Conjunctive Use and Groundwater Recharge $191,677,000 $15,000,000 $9,750,000 $5,250,000 $161,677,000
Ch. 2 91013 Department of Conservation: Multibenefit Land Repurposing Program for Groundwater Sustainability Projects $198,500,000 $32,095,000 $64,900,000 $3,972,000 $97,533,000
Ch. 2 91014 State Water Resources Control Board: Water Reuse and Recycling $383,354,000 $153,400,000 $78,400,000 $8,600,000 $142,954,000
Ch. 2 91015 Department of Water Resources: Water Storage Investment Program $74,438,000 $74,438,000 $0 $0 $0
Ch. 2 91016 Department of Water Resources: Brackish Desalination, Contaminant and Salt Removal, and Salinity Management $62,032,000 $200,000 $600,000 $2,400,000 $58,832,000
Ch. 2 91017 Various: Improve Water Data Management, Reactivate Existing Stream Gages, and Deploy New Gages $14,888,000 $8,281,000 $1,200,000 $692,000 $4,715,000
Ch. 2 91018 Various: Regional Conveyance Projects or Repairs to Existing Conveyances $74,438,000 $2,650,000 $68,798,000 $2,590,000 $400,000
Ch. 2 91019 Department of Water Resources: Water Conservation in Agricultural and Urban Areas $74,438,000 $347,000 $1,265,000 $3,239,000 $69,587,000
Ch. 2 91021(a) Department of Water Resources: Flood Management Projects in Sacramento-San Joaquin Delta $148,875,000 $0 $59,975,000 $9,900,000 $79,000,000
Ch. 2 91021(b) Department of Water Resources: Flood Control Subventions Program $148,875,000 $123,400,000 $24,400,000 $1,075,000 $0
Ch. 2 91021(c) Department of Water Resources: State Plan of Flood Control Projects $248,125,000 $63,125,000 $147,625,000 $1,375,000 $36,000,000
Ch. 2 91022 Department of Water Resources: Dam Safety and Climate Resilience $476,400,000 $231,534,000 $2,083,000 $8,333,000 $234,450,000
Ch. 2 91023 State Water Resources Control Board: Multiple-Benefit Urban Stormwater Management $109,175,000 $1,100,000 $39,400,000 $3,900,000 $64,775,000
Ch. 2 91031 Department of Water Resources: Integrated Regional Water Management $99,250,000 $469,000 $1,500,000 $5,031,000 $92,250,000
Ch. 2 91032(a) San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy: Los Angeles River Watershed or consistent with Lower Los Angeles River Revitalization Plan $39,700,000 $600,000 $10,500,000 $1,800,000 $26,800,000
Ch. 2 91032(b) Santa Monica Mountains Conservancy: Los Angeles River Watershed and Upper Los Angeles River and Tributaries Working group or Los Angeles River Master Plan $39,700,000 $20,400,000 $6,400,000 $1,000,000 $11,900,000
Ch. 2 91032(c) Department of Water Resources: Riverine Stewardship Projects that Improve Climate Resiliency $49,625,000 $1,100,000 $4,815,000 $2,550,000 $41,160,000
Ch. 2 91032(d) State Coastal Conservancy: Santa Ana River Conservancy Program $24,812,000 $10,150,000 $194,000 $0 $14,468,000
Ch. 2 91032(e) Department of Water Resources: Urban Streams Restoration Program $24,812,000 $1,250,000 $10,925,000 $1,200,000 $11,437,000
Ch. 2 91032(f) Secretary for Natural Resources: Wildlife Refuges and Wetland Habitat Improvement $24,812,000 $163,000 $163,000 $652,000 $23,834,000
Ch. 2 91032(g) Wildlife Conservation Board: Lower American River Conservancy Program $9,925,000 $3,000,000 $0 $0 $6,925,000
Ch. 2 91032(h) State Coastal Conservancy: Coyote Valley Conservation Program $24,812,000 $3,050,000 $14,444,000 $776,000 $6,542,000
Ch. 2 91032(i) State Coastal Conservancy: West Coyote Hills Program $24,812,000 $0 $23,256,000 $776,000 $780,000
Ch. 2 91032(j) State Water Resources Control Board: Cross-Border Rivers and Coastal Waters (Tijuana & New River) $49,625,000 $46,551,000 $675,000 $2,025,000 $374,000
Ch. 2 91032(k) Secretary for Natural Resources: Clear Lake Watershed - Climate Resiliency and Protection $19,850,000 $1,930,000 $16,880,000 $520,000 $520,000
Ch. 2 91033(a) Various: Salton Sea Management Program 10-year plan $158,800,000 $148,166,000 $3,143,000 $7,491,000 $0
Ch. 2 91033(b) Salton Sea Conservancy: Salton Sea Conservancy $9,925,000 $1,638,000 $3,224,000 $5,063,000 $0
Ch. 2 91040(a) Wildlife Conservation Board: Stream Flow Enhancement Program $99,250,000 $20,500,000 $10,500,000 $2,000,000 $66,250,000
Ch. 2 91040(b) Wildlife Conservation Board: Habitat Enhancement and Restoration Program $49,625,000 $10,500,000 $500,000 $1,500,000 $37,125,000
Ch. 2 91045 Secretary for Natural Resources: Nature and Climate Education $19,850,000 $15,130,000 $3,680,000 $520,000 $520,000
Ch. 3 91510 Office of Emergency Services: Wildfire Mitigation Grant Program $133,987,000 $13,000,000 $26,050,000 $4,200,000 $90,737,000
Ch. 3 91520(a) Department of Conservation: Regional Forest and Fire Capacity Program $183,612,000 $10,105,000 $50,500,000 $4,025,000 $118,982,000
Ch. 3 91520(b) Various: Regional Projects $168,725,000 $91,357,000 $39,097,000 $5,216,000 $33,055,000
Ch. 3 91520(c) California Department of Forestry and Fire Protection: Forest Health Program $173,687,000 $92,163,000 $36,899,000 $5,600,000 $39,025,000
Ch. 3 91520(d) California Department of Forestry and Fire Protection: Local Fire Prevention Grants $183,612,000 $81,100,000 $57,981,000 $9,531,000 $35,000,000
Ch. 3 91520(e) California Department of Forestry and Fire Protection: Fire Training Center $24,812,000 $2,500,000 $5,000,000 $240,000 $17,072,000
Ch. 3 91520(f) California State Parks: Forest Health and Watershed Improvement Projects $198,500,000 $33,400,000 $33,400,000 $1,600,000 $130,100,000
Ch. 3 91520(g) California Department of Forestry and Fire Protection: Fuel Reduction, Structure Hardening, Defensible space, Reforestation, or Targeted Acquisitions to Improve Forest Health and Fire Resilience $49,625,000 $30,000,000 $19,625,000 $0 $0
Ch. 3 91520(h) Sierra Nevada Conservancy: Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development $33,249,000 $30,954,000 $42,000 $656,000 $1,597,000
Ch. 3 91520(i) California Tahoe Conservancy: Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development $25,309,000 $23,674,000 $150,000 $1,400,000 $85,000
Ch. 3 91520(j) Santa Monica Mountains Conservancy: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development $33,249,000 $31,749,000 $400,000 $1,100,000 $0
Ch. 3 91520(k) State Coastal Conservancy: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development $33,249,000 $31,165,000 $261,000 $1,044,000 $779,000
Ch. 3 91520(l) San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development $33,249,000 $31,104,000 $400,000 $1,545,000 $200,000
Ch. 3 91520(m) San Diego River Conservancy: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development $25,309,000 $23,564,000 $200,000 $800,000 $745,000
Ch. 3 91520(n) California Department of Forestry and Fire Protection: Improve Firefighter Health and Safety, Advance Fire Attack Effectiveness, and Promote Community Resilience and Awareness $14,887,000 $14,037,000 $200,000 $650,000 $0
Ch. 3 91520(o) California Department of Forestry and Fire Protection: Vegetation Mitigation, Fuels Reduction, Public Education and Outreach, Personal Protective Equipment, Specialized Firefighting Equipment, and Firefighter Health and Safety $14,887,000 $14,037,000 $200,000 $650,000 $0
Ch. 3 91530 Department of Conservation: Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses $49,625,000 $10,630,000 $15,407,000 $1,250,000 $22,338,000
Ch. 3 91535 California Department of Forestry and Fire Protection: Fire Ignition Detection Technology $24,812,000 $23,262,000 $1,550,000 $0 $0
Ch. 3 91540 California Department of Forestry and Fire Protection: Reduce Wildfire Risk Related to Electricity Transmission $34,737,000 $0 $15,243,000 $968,000 $18,526,000
Ch. 3 91545(a) California Conservation Corps: Demonstrated Jobs Projects $19,850,000 $0 $1,493,000 $2,334,000 $16,023,000
Ch. 3 91545(b) California Conservation Corps: Demonstrated Jobs Projects for Certified Community Conservation Corps $29,775,000 $10,149,000 $10,149,000 $765,000 $8,712,000
Ch. 4 92010(a) State Coastal Conservancy: Coastal resilience project and programs $327,525,000 $62,900,000 $33,057,000 $8,888,000 $222,680,000
Ch. 4 92010(b) State Coastal Conservancy: San Francisco Bay Restoration Authority Act/SF Bay Conservancy Program $84,362,000 $40,560,000 $661,000 $2,644,000 $40,497,000
Ch. 4 92015 State Coastal Conservancy: Coastal and Combined Flood Management Projects and Activities for Developed Shoreline Areas $347,375,000 $33,295,000 $2,224,000 $8,890,000 $302,966,000
Ch. 4 92020 Secretary for Natural Resources: Increase Ocean and Coastal Resilience from Impacts of Climate Change $133,987,000 $22,750,000 $15,200,000 $3,750,000 $92,287,000
Ch. 4 92030 Secretary for Natural Resources: Sea Level Rise Mitigation and Adaptation $74,437,000 $20,250,000 $25,500,000 $2,350,000 $26,337,000
Ch. 4 92040 California State Parks: Sea Level Rise Adaptation Strategy $49,625,000 $24,000,000 $250,000 $1,000,000 $24,375,000
Ch. 4 92050 Various: Island Ecosystems, Climate-Ready Fisheries Management, and Kelp Ecosystems $74,437,000 $35,795,000 $10,200,000 $2,658,000 $25,784,000
Ch. 4 92060 State Coastal Conservancy: Dam Removal and Related Water Infrastructure $74,437,000 $34,600,000 $583,000 $2,332,000 $36,922,000
Ch. 4 92070 California Department of Fish and Wildlife: Central Valley Chinook Salmon Hatcheries $24,812,000 $5,000,000 $19,812,000 $0 $0
Ch. 5 92510 Land Use and Climate Innovation: Extreme Heat and Community Resilience Program $49,625,000 $23,050,000 $24,125,000 $2,450,000 $0
Ch. 5 92520 Land Use and Climate Innovation: Transformative Climate Communities Program $148,875,000 $1,000,000 $137,375,000 $7,036,000 $3,464,000
Ch. 5 92530 Secretary for Natural Resources: Urban Greening $99,250,000 $46,825,000 $700,000 $2,800,000 $48,925,000
Ch. 5 92540 California Department of Forestry and Fire Protection: Urban Forests $49,625,000 $500,000 $22,750,000 $3,400,000 $22,975,000
Ch. 5 92550 Land Use and Climate Innovation: Community Resilience Centers $59,550,000 $784,000 $55,284,000 $2,243,000 $1,239,000
Ch. 5 92560 California Department of Food and Agriculture: Fairground Upgrades $39,700,000 $37,600,000 $700,000 $1,400,000 $0
Ch. 6 93010 Wildlife Conservation Board: Protect and Enhance Fish and Wildlife $662,990,000 $256,000,000 $111,000,000 $4,500,000 $291,490,000
Ch. 6 93020(a)(1) Baldwin Hills Conservancy: Reduce the Risks of Climate Change Impacts $47,640,000 $12,860,000 $400,000 $1,600,000 $32,780,000
Ch. 6 93020(a)(2) California Tahoe Conservancy: Reduce the Risks of Climate Change Impacts $28,782,000 $5,372,000 $3,550,000 $18,480,000 $1,380,000
Ch. 6 93020(a)(3) Coachella Valley Mountains Conservancy: Reduce the Risks of Climate Change Impacts $10,917,000 $2,300,000 $2,300,000 $450,000 $5,867,000
Ch. 6 93020(a)(4) Sacramento-San Joaquin Delta Conservancy: Reduce the Risks of Climate Change Impacts $28,782,000 $4,300,000 $15,350,000 $600,000 $8,532,000
Ch. 6 93020(a)(5) San Diego River Conservancy: Reduce the Risks of Climate Change Impacts $47,640,000 $8,100,000 $200,000 $800,000 $38,540,000
Ch. 6 93020(a)(6) San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy: Reduce the Risks of Climate Change Impacts $47,640,000 $10,300,000 $11,450,000 $2,000,000 $23,890,000
Ch. 6 93020(a)(7) San Joaquin River Conservancy: Reduce the Risks of Climate Change Impacts $10,918,000 $5,307,000 $5,227,000 $384,000 $0
Ch. 6 93020(a)(8) Santa Monica Mountains Conservancy: Reduce the Risks of Climate Change Impacts $47,640,000 $25,400,000 $7,400,000 $800,000 $14,040,000
Ch. 6 93020(a)(9) Sierra Nevada Conservancy: Reduce the Risks of Climate Change Impacts $47,640,000 $9,925,000 $59,000 $944,000 $36,712,000
Ch. 6 93010; 93030 ref 1 Wildlife Conservation Board: Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors $99,250,000 $20,500,000 $20,500,000 $2,000,000 $56,250,000
Ch. 6 93010; 93030 ref 2 Wildlife Conservation Board: San Andreas Corridor Program $79,400,000 $0 $20,000,000 $0 $59,400,000
Ch. 6 93040 Secretary for Natural Resources: Tribal Nature-Based Solutions Program $9,925,000 $9,400,000 $175,000 $350,000 $0
Ch. 6 93010; 93050 Wildlife Conservation Board: Southern Ballona Creek Watershed $21,835,000 $20,000,000 $1,835,000 $0 $0
Ch. 7 93510(a) California Department of Food and Agriculture: Soil Health, Atmospheric Carbon Removal, or Soil Carbon Sequestration $64,513,000 $35,910,000 $25,873,000 $2,730,000 $0
Ch. 7 93510(b) California Department of Food and Agriculture: State Water Efficiency and Enhancement Program $39,700,000 $37,600,000 $700,000 $1,400,000 $0
Ch. 7 93520 California Department of Food and Agriculture: Invasive Species Projects $19,850,000 $19,850,000 $0 $0 $0
Ch. 7 93530 Department of Conservation: Protection, Restoration, Conservation and Enhancement of Farm and Range Lands $14,888,000 $7,000,000 $150,000 $550,000 $7,188,000
Ch. 7 93540(a) California Department of Food and Agriculture: Certified Mobile Farmers' Markets $19,850,000 $9,600,000 $9,550,000 $700,000 $0
Ch. 7 93540(b) California Department of Food and Agriculture: Year-Round Certified Farmers' Markets $19,850,000 $9,600,000 $9,550,000 $700,000 $0
Ch. 7 93540(c) California Department of Food and Agriculture: Urban Agriculture Projects $19,850,000 $18,800,000 $350,000 $700,000 $0
Ch. 7 93540(d) California Department of Food and Agriculture: Regional Farm Equipment Sharing $14,888,000 $210,000 $14,048,000 $630,000 $0
Ch. 7 93540(e) California Department of Food and Agriculture: Tribal Food Sovereignty $14,888,000 $210,000 $14,048,000 $630,000 $0
Ch. 7 93550 Department of Conservation: Land Access and Tenure for Socially Disadvantaged Farmers or Ranchers, Tribal Producers, and Beginning Farmers and Ranchers $29,775,000 $0 $4,975,000 $900,000 $23,900,000
Ch. 7 93560 Unspecified: Vanpool Vehicles, Clean Technologies, and Infrastructure $14,888,000 $0 $0 $0 $14,888,000
Ch. 7 93570 Department of Education: Postsecondary Educational Institutions to Develop Research Farms to Improve Climate Resiliency $14,888,000 $14,888,000 $0 $0 $0
Ch. 7 93580 Department of Community Services and Development: Farmworkers Housing Component of the Low-Income Weatherization Program $9,925,000 $230,000 $9,459,000 $236,000 $0
Ch. 8 94010(a) California State Parks: Creation, Expansion, and Renovation of Safe Neighborhood Parks $178,650,000 $171,000,000 $1,710,000 $5,940,000 $0
Ch. 8 94010(c) California State Parks: Rehabilitation, Repurposing, or Substantial Improvement of Existing Park Infrastructure $19,850,000 $19,000,000 $190,000 $660,000 $0
Ch. 8 94020 Various: Reduction of Climate Impacts and Creation, Protection and Expansion of Outdoor Recreation $198,500,000 $118,547,000 $25,866,000 $5,520,000 $48,567,000
Ch. 8 94030 Various: Enhancement of the Natural Resource Value and Expanded Trail Access (non-motorized) $99,250,000 $55,700,000 $700,000 $1,699,000 $41,151,000
Ch. 8 94040 California State Parks: Deferred Maintenance $173,688,000 $84,400,000 $400,000 $1,325,000 $87,563,000
Ch. 8 94050 Secretary for Natural Resources: Nature Education Facilities $24,813,000 $17,400,000 $6,333,000 $540,000 $540,000
Ch. 9 94520 California Infrastructure and Economic Development Bank: Public Financing of Clean Energy Transmission Projects $322,563,000 $0 $322,563,000 $0 $0
Ch. 9 94530 Energy Resources Conservation and Development Commission: Long-Duration Energy Storage Program $49,625,000 $46,641,000 $497,000 $1,989,000 $498,000
Ch. 9 94540 Energy Resources Conservation and Development Commission: Development of offshore wind generation $471,438,000 $228,219,000 $2,500,000 $10,000,000 $230,719,000
Program Total: $9,925,000,000 $3,470,917,000 $2,103,558,000 $265,150,000 $4,085,375,000
Statewide Costs Requiring Appropriations: $1,998,000 $2,733,000 $17,258,000
Total Appropriations: $3,472,915,000 $2,106,291,000 $282,408,000

Numbers may not add or match to other statements due to rounding of budget details.

* Pursuant to PRC Section 90135 and 95011, the Net Allocation for the $10 billion bond has been reduced by $75,000,000 for bond issuance costs and other statewide bond costs.

Prop. 4: Detailed Allocations, Appropriations, Proposals, Set Asides and Balances

(Amounts Are in Whole Dollars)

Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91011

Allocation: Improve Water Quality or provide Clean, Safe, Reliable Drinking Water

Net Allocation: $578,613,000


Grants or loans that improve water quality or help provide clean, safe, and reliable drinking water.


PRC §91011

Department: State Water Resources Control Board

Purpose Type: Program Delivery

Chapter 2 PRC §91011
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-001-6093 (1) 3560 Budget Act $2,604,000 Water Quality and Clean, Safe Reliable Drinking Water 06/30/2026 06/30/2028 B1215PD
Proposed 2026 3940-001-6093 (1) 3560 Budget Act $2,604,000 Water Quality and Clean, Safe Reliable Drinking Water 06/30/2027 06/30/2029 B1215PD

Program Delivery Enacted Total: $2,604,000

Program Delivery Proposed Total: $2,604,000

PRC §91011

Department: State Water Resources Control Board

Purpose Type: Projects

Chapter 2 PRC §91011
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-101-6093 (1) 3560 Budget Act $180,563,000 Water Quality and Clean, Safe Reliable Drinking Water 06/30/2030 06/30/2033 B1215PJ
Proposed 2026 3940-101-6093 (1) 3560 Budget Act $157,563,000 Water Quality and Clean, Safe Reliable Drinking Water 06/30/2031 06/30/2034 B1215PJ

Projects Enacted Total: $180,563,000

Projects Proposed Total: $157,563,000


Summary for PRC §91011 - Improve Water Quality or provide Clean, Safe, Reliable Drinking Water

Allocation:

$583,000,000

Statewide Bond Costs:

$4,387,000

Enacted/Proposed Total:

$343,334,000

Outyear Commitments:

$9,711,000

Balance:

$225,568,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91011(a)(8)

Allocation: Tribal Water Infrastructure Projects

Net Allocation: $26,812,000


Tribal water infrastructure projects that provide safe, clean, and reliable drinking water to tribal communities.


PRC §91011(a)(8)

Department: State Water Resources Control Board

Purpose Type: Program Delivery

Chapter 2 PRC §91011(a)(8)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-002-6093 (1) 3560 Budget Act $475,000 Tribal Water Infrastructure 06/30/2026 06/30/2028 B1216PD
Proposed 2026 3940-002-6093 (1) 3560 Budget Act $475,000 Tribal Water Infrastructure 06/30/2027 06/30/2029 B1216PD

Program Delivery Enacted Total: $475,000

Program Delivery Proposed Total: $475,000

PRC §91011(a)(8)

Department: State Water Resources Control Board

Purpose Type: Projects

Chapter 2 PRC §91011(a)(8)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-102-6093 (1) 3560 Budget Act $10,680,000 Tribal Water Infrastructure 06/30/2030 06/30/2033 B1216PJ
Proposed 2026 3940-102-6093 (1) 3560 Budget Act $12,395,000 Tribal Water Infrastructure 06/30/2031 06/30/2034 B1216PJ

Projects Enacted Total: $10,680,000

Projects Proposed Total: $12,395,000


Summary for PRC §91011(a)(8) - Tribal Water Infrastructure Projects

Allocation:

$27,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$24,025,000

Outyear Commitments:

$787,000

Balance:

$2,000,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91012(a) and (b)

Allocation: Groundwater Storage or Banking (Sustainable Groundwater Management Act)

Net Allocation: $191,677,000


Projects that increase groundwater storage, improve the management and operation of groundwater storage, or are for groundwater banking, and support implementation of the Sustainable Groundwater Management Act (Part 2.74 (commencing with Section 10720) of Division 6 of the Water Code). Of the funds made available pursuant to section 91012(b) and (c), a minimum of $25,000,000 shall be for projects that provide direct benefits to tribal communities.


PRC §91012(a) and (b)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91012(a) and (b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-002-6093 (1) 3230 Budget Act $1,000,000 Groundwater Storage/Banking/Recharge and Instream Flow 06/30/2026 06/30/2028 B1175PD
Proposed 2026 3860-002-6093 (1) 3230 Budget Act $2,000,000 Sustainable Groundwater Management Act Implementation 06/30/2027 06/30/2029 B1175PD

Program Delivery Enacted Total: $1,000,000

Program Delivery Proposed Total: $2,000,000

PRC §91012(a) and (b)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91012(a) and (b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $9,000,000 Groundwater Storage/Banking/Recharge and Instream Flow for Conjunctive Use of Groundwater and Surface Water Supplies 06/30/2028 06/30/2030 B1175PJ
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $1,750,000 Groundwater Sustainability Agencies Less than 10,000 Acre-Feet 06/30/2028 06/30/2030 B1175PJ
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $7,750,000 Sustainable Groundwater Management Act Implementation 06/30/2027 06/30/2029 B1175PJ

Projects Enacted Total: $10,750,000

Projects Proposed Total: $7,750,000

PRC §91012(a) and (b)

Department: Department of Water Resources

Purpose Type: Technical Assistance

Chapter 2 PRC §91012(a) and (b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $3,250,000 Underrepresented Communities, California Tribes, and Small Farmers Groundwater Technical Assistance 06/30/2028 06/30/2030 B1175TA

Technical Assistance Enacted Total: $3,250,000


Summary for PRC §91012(a) and (b) - Groundwater Storage or Banking (Sustainable Groundwater Management Act)

Allocation:

$193,125,000

Statewide Bond Costs:

$1,448,000

Enacted/Proposed Total:

$24,750,000

Outyear Commitments:

$5,250,000

Balance:

$161,677,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91012(a) and (c)

Allocation: Conjunctive Use and Groundwater Recharge

Net Allocation: $191,677,000


Projects that support conjunctive use and groundwater recharge. Projects shall: (A) Provide improved regional watershed management; (B) Address current and projected drought conditions and demonstrate adaptation to climate change for a region; (C) Provide ecosystem benefits to fish and wildlife and improve stream flow for anadromous fish. Of the funds made available pursuant to section 91012(b) and (c), a minimum of $25,000,000 shall be for projects that provide direct benefits to tribal communities.


PRC §91012(a) and (c)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91012(a) and (c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-002-6093 (1) 3230 Budget Act $1,000,000 Groundwater Storage/Banking/Recharge and Instream Flow 06/30/2026 06/30/2028 B1177PD
Proposed 2026 3860-002-6093 (1) 3230 Budget Act $2,000,000 Conjunctive Use and Groundwater Recharge 06/30/2027 06/30/2029 B1177PD

Program Delivery Enacted Total: $1,000,000

Program Delivery Proposed Total: $2,000,000

PRC §91012(a) and (c)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91012(a) and (c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $9,000,000 Groundwater Storage/Banking/Recharge and Instream Flow for Conjunctive Use of Groundwater and Surface Water Supplies 06/30/2028 06/30/2030 B1177PJ
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $1,750,000 Groundwater Sustainability Agencies Less than 10,000 Acre-Feet 06/30/2028 06/30/2030 B1177PJ
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $7,750,000 Conjunctive Use and Groundwater Recharge 06/30/2027 06/30/2029 B1177PJ

Projects Enacted Total: $10,750,000

Projects Proposed Total: $7,750,000

PRC §91012(a) and (c)

Department: Department of Water Resources

Purpose Type: Technical Assistance

Chapter 2 PRC §91012(a) and (c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $3,250,000 Underrepresented Communities, California Tribes, and Small Farmers Groundwater Technical Assistance 06/30/2028 06/30/2030 B1177TA

Technical Assistance Enacted Total: $3,250,000


Summary for PRC §91012(a) and (c) - Conjunctive Use and Groundwater Recharge

Allocation:

$193,125,000

Statewide Bond Costs:

$1,448,000

Enacted/Proposed Total:

$24,750,000

Outyear Commitments:

$5,250,000

Balance:

$161,677,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91013

Allocation: Multibenefit Land Repurposing Program for Groundwater Sustainability Projects

Net Allocation: $198,500,000


Department of Conservation’s Multibenefit Land Repurposing Program for groundwater sustainability projects that reduce groundwater use, repurpose irrigated agricultural land, provide wildlife habitat, improve drought resilience or floodwater management, or support implementation of the Sustainable Groundwater Management Act (Part 2.74 (commencing with Section 10720) of Division 6 of the Water Code).


PRC §91013

Department: Department of Conservation

Purpose Type: Program Delivery

Chapter 2 PRC §91013
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-001-6093 (1) 2430 Budget Act $95,000 Multibenefit Land Repurposing Program (MLRP) 06/30/2026 06/30/2028 B1055PD
Proposed 2026 3480-001-6093 (1) 2430 Budget Act $900,000 Multibenefit Land Repurposing Program (MLRP) 06/30/2027 06/30/2029 B1055PD

Program Delivery Enacted Total: $95,000

Program Delivery Proposed Total: $900,000

PRC §91013

Department: Department of Conservation

Purpose Type: Projects

Chapter 2 PRC §91013
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-101-6093 (1) 2430 Budget Act $32,000,000 Multibenefit Land Repurposing Program (MLRP) 06/30/2028 06/30/2030 B1055PJ
Proposed 2026 3480-101-6093 (1) 2430 Budget Act $64,000,000 Multibenefit Land Repurposing Program (MLRP) 06/30/2029 06/30/2031 B1055PJ

Projects Enacted Total: $32,000,000

Projects Proposed Total: $64,000,000


Summary for PRC §91013 - Multibenefit Land Repurposing Program for Groundwater Sustainability Projects

Allocation:

$200,000,000

Statewide Bond Costs:

$1,500,000

Enacted/Proposed Total:

$96,995,000

Outyear Commitments:

$3,972,000

Balance:

$97,533,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91014

Allocation: Water Reuse and Recycling

Net Allocation: $383,354,000


Grants and projects related to water reuse and recycling, including, but not limited to, the following: (1) Treatment, storage, conveyance, and distribution facilities for potable and nonpotable recycling projects; (2) Dedicated distribution infrastructure to serve residential, commercial, agricultural, and industrial end user retrofit projects to allow use of recycled water; (3) Multiple-benefit recycled water projects that improve water quality.


PRC §91014

Department: State Water Resources Control Board

Purpose Type: Program Delivery

Chapter 2 PRC §91014
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-003-6093 (1) 3560 Budget Act $3,400,000 Water Reuse and Recycling 06/30/2026 06/30/2028 B1217PD
Proposed 2026 3940-003-6093 (1) 3560 Budget Act $3,400,000 Water Reuse and Recycling 06/30/2027 06/30/2029 B1217PD

Program Delivery Enacted Total: $3,400,000

Program Delivery Proposed Total: $3,400,000

PRC §91014

Department: State Water Resources Control Board

Purpose Type: Projects

Chapter 2 PRC §91014
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-103-6093 (1) 3560 Budget Act $150,000,000 Water Reuse and Recycling 06/30/2030 06/30/2033 B1217PJ
Proposed 2026 3940-103-6093 (1) 3560 Budget Act $75,000,000 Water Reuse and Recycling 06/30/2031 06/30/2034 B1217PJ

Projects Enacted Total: $150,000,000

Projects Proposed Total: $75,000,000


Summary for PRC §91014 - Water Reuse and Recycling

Allocation:

$386,250,000

Statewide Bond Costs:

$2,896,000

Enacted/Proposed Total:

$231,800,000

Outyear Commitments:

$8,600,000

Balance:

$142,954,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91015

Allocation: Water Storage Investment Program

Net Allocation: $74,438,000


Projects under the Water Storage Investment Program. Priority for these funds and any funds returned to the commission shall be to support timely completion of existing approved projects by providing supplemental grants to reflect the increase in costs due to inflation since the original grant applications and any increase in public benefits.


PRC §91015

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91015
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-004-6093 (1) 3230 Budget Act $375,000 California Water Commission - Projects under the Water Storage Investment Plan 06/30/2026 06/30/2028 B1205PD

Program Delivery Enacted Total: $375,000

PRC §91015

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91015
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-104-6093 (1) 3230 Budget Act $74,063,000 California Water Commission - Projects under the Water Storage Investment Plan 06/30/2028 06/30/2030 B1205PJ

Projects Enacted Total: $74,063,000


Summary for PRC §91015 - Water Storage Investment Program

Allocation:

$75,000,000

Statewide Bond Costs:

$562,000

Enacted/Proposed Total:

$74,438,000

Outyear Commitments:

$0

Balance:

$0


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91016

Allocation: Brackish Desalination, Contaminant and Salt Removal, and Salinity Management

Net Allocation: $62,032,000


Capital investments in brackish desalination, contaminant and salt removal, and salinity management projects to improve California water and drought resilience. Priority shall be given to projects that use new incremental eligible renewable energy resources during operation and reduce greenhouse gas emissions associated with their construction and operation.


PRC §91016

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91016
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $200,000 Brackish Desalination, Contaminant, and Salt removal, and Salinity Management Projects 06/30/2026 06/30/2028 B1179PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $600,000 Desalination Grant Program 06/30/2027 06/30/2029 B1179PD

Program Delivery Enacted Total: $200,000

Program Delivery Proposed Total: $600,000


Summary for PRC §91016 - Brackish Desalination, Contaminant and Salt Removal, and Salinity Management

Allocation:

$62,500,000

Statewide Bond Costs:

$468,000

Enacted/Proposed Total:

$800,000

Outyear Commitments:

$2,400,000

Balance:

$58,832,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91017

Allocation: Improve Water Data Management, Reactivate Existing Stream Gages, and Deploy New Gages

Net Allocation: $14,888,000


Improve water data management and to implement Section 144 of the Water Code to reactivate existing stream gages and deploy new gages.


PRC §91017

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91017
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $140,000 Improve Water Data Management and Reactivate Existing and Deploy New Gages 06/30/2026 06/30/2028 B1180PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $140,000 California Stream Gage Improvement Program (CalSIP) 06/30/2027 06/30/2029 B1180PD

Program Delivery Enacted Total: $140,000

Program Delivery Proposed Total: $140,000

PRC §91017

Department: State Water Resources Control Board

Purpose Type: Program Delivery

Chapter 2 PRC §91017
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-004-6093 (1) 3570 Budget Act $25,000 Improve Water Data Management and Reactivate Existing and Deploy New Gages 06/30/2026 06/30/2028 B1218PD
Proposed 2026 3940-004-6093 (1) 3570 Budget Act $50,000 Improve Water Data Management and Reactivate Existing and Deploy New Gages 06/30/2027 06/30/2029 B1218PD

Program Delivery Enacted Total: $25,000

Program Delivery Proposed Total: $50,000

PRC §91017

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91017
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-106-6093 (1) 3230 Budget Act $7,785,000 Reactivate Existing Stream Gages and Deploy New Gages 06/30/2028 06/30/2030 B1180PJ
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $360,000 California Stream Gage Improvement Program (CalSIP) 06/30/2027 06/30/2029 B1180PJ

Projects Enacted Total: $7,785,000

Projects Proposed Total: $360,000

PRC §91017

Department: State Water Resources Control Board

Purpose Type: Projects

Chapter 2 PRC §91017
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-104-6093 (1) 3570 Budget Act $331,000 Improve Water Data Management and Reactivate Existing and Deploy New Gages 06/30/2028 06/30/2030 B1218PJ
Proposed 2026 3940-104-6093 (1) 3570 Budget Act $650,000 Improve Water Data Management and Reactivate Existing and Deploy New Gages 06/30/2029 06/30/2031 B1218PJ

Projects Enacted Total: $331,000

Projects Proposed Total: $650,000


Summary for PRC §91017 - Improve Water Data Management, Reactivate Existing Stream Gages, and Deploy New Gages

Allocation:

$15,000,000

Statewide Bond Costs:

$112,000

Enacted/Proposed Total:

$9,481,000

Outyear Commitments:

$692,000

Balance:

$4,715,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91018

Allocation: Regional Conveyance Projects or Repairs to Existing Conveyances

Net Allocation: $74,438,000


Competitive grants for regional conveyance projects or repairs to existing conveyances. Priority shall be given to projects that provide one or more of the following benefits: (a) Improvements in regional or interregional water supply or water supply reliability; (b) Increased groundwater recharge or mitigation of conditions of groundwater overdraft, salinity intrusion, water quality degradation, or subsidence; (c) Adaptation to the impacts of hydrologic changes; (d) Improvements in water security from drought, natural disasters, or other events that could interrupt water supplies; (e) Providing safe drinking water for disadvantaged communities and economically distressed areas.


PRC §91018

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91018
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $798,000 Repairs to Existing Conveyances 06/30/2027 06/30/2029 B1011PD

Program Delivery Proposed Total: $798,000

PRC §91018

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91018
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $650,000 Regional Conveyance Projects or Repairs to Existing Conveyances 06/30/2026 06/30/2028 B1181PD

Program Delivery Enacted Total: $650,000

PRC §91018

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 2 PRC §91018
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 0540-101-6093 (1) 0320 Budget Act $68,000,000 Regional Conveyance Projects or Repairs to Existing Conveyances 06/30/2029 06/30/2031 B1011PJ

Projects Proposed Total: $68,000,000

PRC §91018

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91018
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-101-6093 (1) 3230 Budget Act $2,000,000 Subsidence Repair Projects Related to Existing Conveyance Projects 06/30/2028 06/30/2030 B1181PJ

Projects Enacted Total: $2,000,000


Summary for PRC §91018 - Regional Conveyance Projects or Repairs to Existing Conveyances

Allocation:

$75,000,000

Statewide Bond Costs:

$562,000

Enacted/Proposed Total:

$71,448,000

Outyear Commitments:

$2,590,000

Balance:

$400,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91019

Allocation: Water Conservation in Agricultural and Urban Areas

Net Allocation: $74,438,000


Projects that increase water conservation in agricultural and urban areas.


PRC §91019

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91019
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $197,000 CIMIS Expansion and Site Improvement Project 06/30/2026 06/30/2028 B1182PD
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $150,000 Watershed Resilience Grant Program 06/30/2026 06/30/2028 B1183PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $39,000 CIMIS Expansion and Site Improvement Project 06/30/2027 06/30/2029 B1182PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $484,000 Watershed Resilience Grant Program 06/30/2027 06/30/2029 B1183PD

Program Delivery Enacted Total: $347,000

Program Delivery Proposed Total: $523,000

PRC §91019

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91019
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3860-102-6093 (1) 3230 Budget Act $742,000 Increasing Water Conservation in Urban and Agricultural Areas 06/30/2029 06/30/2031 B1182PJ

Projects Proposed Total: $742,000


Summary for PRC §91019 - Water Conservation in Agricultural and Urban Areas

Allocation:

$75,000,000

Statewide Bond Costs:

$562,000

Enacted/Proposed Total:

$1,612,000

Outyear Commitments:

$3,239,000

Balance:

$69,587,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91021(a)

Allocation: Flood Management Projects in Sacramento-San Joaquin Delta

Net Allocation: $148,875,000


Projects in the Sacramento-San Joaquin Delta to improve existing levees to increase flood protection and improve climate resiliency. For purposes of this subdivision, “Sacramento-San Joaquin Delta” has the same meaning as described in Section 12220 of the Water Code.


PRC §91021(a)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91021(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3860-003-6093 (1) 3245 Budget Act $600,000 Delta Levees Program 06/30/2027 06/30/2029 B1184PD

Program Delivery Proposed Total: $600,000

PRC §91021(a)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91021(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3860-103-6093 (1) 3245 Budget Act $59,375,000 Delta Levees Program 06/30/2029 06/30/2031 B1184PJ

Projects Proposed Total: $59,375,000


Summary for PRC §91021(a) - Flood Management Projects in Sacramento-San Joaquin Delta

Allocation:

$150,000,000

Statewide Bond Costs:

$1,125,000

Enacted/Proposed Total:

$59,975,000

Outyear Commitments:

$9,900,000

Balance:

$79,000,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91021(b)

Allocation: Flood Control Subventions Program

Net Allocation: $148,875,000


Projects that implement the Flood Control Subventions Program


PRC §91021(b)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91021(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-003-6093 (1) 3245 Budget Act $5,500,000 Flood Management Projects: Flood Control Subventions Program 06/30/2026 06/30/2028 B1185PD
Proposed 2026 3860-003-6093 (1) 3245 Budget Act $650,000 Statewide Flood Control Subventions 06/30/2027 06/30/2029 B1185PD

Program Delivery Enacted Total: $5,500,000

Program Delivery Proposed Total: $650,000

PRC §91021(b)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91021(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-105-6093 (1) 3245 Budget Act $104,500,000 Flood Control Subventions Program 06/30/2028 06/30/2030 B1185PJ
Enacted 2025 3860-105-6093 (1) 3245 Budget Act $13,400,000 Flood Control Subventions Program - Flood Protection for Multiple Counties and Disadvantaged Communities 06/30/2028 06/30/2030 B1185PJ
Proposed 2026 3860-105-6093 (1) 3245 Budget Act $23,750,000 Flood Control Subventions Program 06/30/2029 06/30/2031 B1185PJ

Projects Enacted Total: $117,900,000

Projects Proposed Total: $23,750,000


Summary for PRC §91021(b) - Flood Control Subventions Program

Allocation:

$150,000,000

Statewide Bond Costs:

$1,125,000

Enacted/Proposed Total:

$147,800,000

Outyear Commitments:

$1,075,000

Balance:

$0


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91021(c)

Allocation: State Plan of Flood Control Projects

Net Allocation: $248,125,000


Projects related to the systemwide evaluation, repair, rehabilitation, reconstruction, expansion, or replacement of levees, weirs, bypasses, and facilities of the State Plan of Flood Control.


PRC §91021(c)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91021(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-003-6093 (1) 3245 Budget Act $625,000 State Plan of Flood Control 06/30/2026 06/30/2028 B1186PD
Proposed 2026 3860-003-6093 (1) 3245 Budget Act $1,500,000 Small Communities Flood Risk Reduction 06/30/2027 06/30/2029 B1186PD

Program Delivery Enacted Total: $625,000

Program Delivery Proposed Total: $1,500,000

PRC §91021(c)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91021(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-103-6093 (1) 3245 Budget Act $33,600,000 State Plan of Flood Control 06/30/2028 06/30/2030 B1186PJ
Enacted 2025 3860-103-6093 (1) 3245 Budget Act $15,000,000 State Plan of Flood Control 06/30/2028 06/30/2030 B1187PJ
Enacted 2025 3860-302-6093 (1)(b) 0000743 Budget Act $13,600,000 Urban Flood Risk Reduction - Construction 06/30/2028 06/30/2030 B1188PJ
Enacted 2025 3860-302-6093 (1)(a) 0000743 Budget Act $300,000 Urban Flood Risk Reduction - Preliminary Plans 06/30/2028 06/30/2030 B1188PJ
Proposed 2026 3860-103-6093 (1) 3245 Budget Act $12,900,000 Small Communities Flood Risk Reduction 06/30/2029 06/30/2031 B1186PJ
Proposed 2026 3860-302-6093 (2)(a) 0000745 Budget Act $24,124,000 Systemwide Flood Risk Reduction: Construction 06/30/2029 06/30/2031 B1187PJ
Proposed 2026 3860-302-6093 (2)(b) 0000745 Budget Act $1,000 Systemwide Flood Risk Reduction: Various 06/30/2029 06/30/2031 B1187PJ
Proposed 2026 3860-302-6093 (1)(a) 0000743 Budget Act $109,099,000 Urban Flood Risk Reduction Program: Construction 06/30/2029 06/30/2031 B1188PJ
Proposed 2026 3860-302-6093 (1)(b) 0000743 Budget Act $1,000 Urban Flood Risk Reduction Program: Various 06/30/2029 06/30/2031 B1188PJ

Projects Enacted Total: $62,500,000

Projects Proposed Total: $146,125,000


Summary for PRC §91021(c) - State Plan of Flood Control Projects

Allocation:

$250,000,000

Statewide Bond Costs:

$1,875,000

Enacted/Proposed Total:

$210,750,000

Outyear Commitments:

$1,375,000

Balance:

$36,000,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91022

Allocation: Dam Safety and Climate Resilience

Net Allocation: $476,400,000


Dam Safety and Climate Resilience Local Assistance Program for competitive grants for projects that enhance dam safety and reservoir operations and protect public benefits pursuant to Section 6700 of the Water Code.


PRC §91022

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91022
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-003-6093 (1) 3245 Budget Act $3,334,000 Dam Safety and Climate Resilience 06/30/2026 06/30/2028 B1189PD
Proposed 2026 3860-003-6093 (1) 3245 Budget Act $2,083,000 Dam Safety and Climate Resilience Grant Program 06/30/2027 06/30/2029 B1189PD

Program Delivery Enacted Total: $3,334,000

Program Delivery Proposed Total: $2,083,000

PRC §91022

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91022
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-103-6093 (1) 3245 Budget Act $228,200,000 Dam Safety and Climate Resilience Local Assistance Program 06/30/2028 06/30/2030 B1189PJ

Projects Enacted Total: $228,200,000


Summary for PRC §91022 - Dam Safety and Climate Resilience

Allocation:

$480,000,000

Statewide Bond Costs:

$3,600,000

Enacted/Proposed Total:

$233,617,000

Outyear Commitments:

$8,333,000

Balance:

$234,450,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91023

Allocation: Multiple-Benefit Urban Stormwater Management

Net Allocation: $109,175,000


Projects funded pursuant to this section shall address flooding in urbanized areas and provide multiple benefits, with preference given to natural infrastructure projects. Eligible stormwater projects shall include, but are not limited to, stormwater capture and reuse, planning and implementation of low-impact development, restoration of urban streams and watersheds, debris flow mitigation, and increasing permeable surfaces to help reduce flooding.


PRC §91023

Department: State Water Resources Control Board

Purpose Type: Program Delivery

Chapter 2 PRC §91023
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-005-6093 (1) 3560 Budget Act $1,100,000 Multibenefit Urban Stormwater Management Projects 06/30/2026 06/30/2028 B1219PD
Proposed 2026 3940-005-6093 (1) 3560 Budget Act $1,400,000 Multibenefit Urban Stormwater Management Projects 06/30/2027 06/30/2029 B1219PD

Program Delivery Enacted Total: $1,100,000

Program Delivery Proposed Total: $1,400,000

PRC §91023

Department: State Water Resources Control Board

Purpose Type: Projects

Chapter 2 PRC §91023
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3940-105-6093 (1) 3560 Budget Act $38,000,000 Multibenefit Urban Stormwater Management Projects 06/30/2029 06/30/2032 B1219PJ

Projects Proposed Total: $38,000,000


Summary for PRC §91023 - Multiple-Benefit Urban Stormwater Management

Allocation:

$110,000,000

Statewide Bond Costs:

$825,000

Enacted/Proposed Total:

$40,500,000

Outyear Commitments:

$3,900,000

Balance:

$64,775,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91031

Allocation: Integrated Regional Water Management

Net Allocation: $99,250,000


Projects related to integrated regional water management to improve climate resilience on a watershed basis. The department shall update and revise the guidelines for the integrated regional water management program to address impacts associated with climate risk.


PRC §91031

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91031
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $469,000 Integrated Regional Water Management 06/30/2026 06/30/2028 B1190PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $1,500,000 Watershed Resilience Program 06/30/2027 06/30/2029 B1190PD

Program Delivery Enacted Total: $469,000

Program Delivery Proposed Total: $1,500,000


Summary for PRC §91031 - Integrated Regional Water Management

Allocation:

$100,000,000

Statewide Bond Costs:

$750,000

Enacted/Proposed Total:

$1,969,000

Outyear Commitments:

$5,031,000

Balance:

$92,250,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(a)

Allocation: Los Angeles River Watershed or consistent with Lower Los Angeles River Revitalization Plan

Net Allocation: $39,700,000


Projects that improve the climate resiliency or the protection of the Los Angeles River Watershed or are consistent with the Lower Los Angeles River Revitalization Plan.


PRC §91032(a)

Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy

Purpose Type: Program Delivery

Chapter 2 PRC §91032(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3825-001-6093 (1) 2990 Budget Act $100,000 Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan 06/30/2026 06/30/2028 B1145PD
Proposed 2026 3825-001-6093 (1) 2990 Budget Act $500,000 Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan 06/30/2027 06/30/2029 B1145PD

Program Delivery Enacted Total: $100,000

Program Delivery Proposed Total: $500,000

PRC §91032(a)

Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy

Purpose Type: Projects

Chapter 2 PRC §91032(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3825-101-6093 (1) 2990 Budget Act $500,000 Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan 06/30/2028 06/30/2030 B1145PJ
Proposed 2026 3825-101-6093 (1) 2990 Budget Act $10,000,000 Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan 06/30/2029 06/30/2031 B1145PJ

Projects Enacted Total: $500,000

Projects Proposed Total: $10,000,000


Summary for PRC §91032(a) - Los Angeles River Watershed or consistent with Lower Los Angeles River Revitalization Plan

Allocation:

$40,000,000

Statewide Bond Costs:

$300,000

Enacted/Proposed Total:

$11,100,000

Outyear Commitments:

$1,800,000

Balance:

$26,800,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(b)

Allocation: Los Angeles River Watershed and Upper Los Angeles River and Tributaries Working group or Los Angeles River Master Plan

Net Allocation: $39,700,000


Projects that improve the climate resiliency or the protection of the Los Angeles River Watershed and are a part of the revitalization plan developed by the Upper Los Angeles River and Tributaries Working Group pursuant to Section 33220 or the Los Angeles River Master Plan.


PRC §91032(b)

Department: Santa Monica Mountains Conservancy

Purpose Type: Program Delivery

Chapter 2 PRC §91032(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-001-6093 (1) 2940 Budget Act $400,000 Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries 06/30/2026 06/30/2028 B1135PD
Proposed 2026 3810-001-6093 (1) 2940 Budget Act $400,000 Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries 06/30/2027 06/30/2029 B1135PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $400,000

PRC §91032(b)

Department: Santa Monica Mountains Conservancy

Purpose Type: Projects

Chapter 2 PRC §91032(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-101-6093 (1) 2945 Budget Act $20,000,000 Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries 06/30/2028 06/30/2030 B1135PJ
Proposed 2026 3810-101-6093 (1) 2945 Budget Act $6,000,000 Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries 06/30/2029 06/30/2031 B1135PJ

Projects Enacted Total: $20,000,000

Projects Proposed Total: $6,000,000


Summary for PRC §91032(b) - Los Angeles River Watershed and Upper Los Angeles River and Tributaries Working group or Los Angeles River Master Plan

Allocation:

$40,000,000

Statewide Bond Costs:

$300,000

Enacted/Proposed Total:

$26,800,000

Outyear Commitments:

$1,000,000

Balance:

$11,900,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(c)

Allocation: Riverine Stewardship Projects that Improve Climate Resiliency

Net Allocation: $49,625,000


Projects that improve climate resiliency under the Riverine Stewardship Program established pursuant to Water Code Section 7049.


PRC §91032(c)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91032(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $100,000 Riverine Stewardship Program 06/30/2026 06/30/2028 B1191PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $356,000 Riverine Stewardship Program 06/30/2027 06/30/2029 B1191PD

Program Delivery Enacted Total: $100,000

Program Delivery Proposed Total: $356,000

PRC §91032(c)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91032(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $1,000,000 Riverine Stewardship Program 06/30/2028 06/30/2030 B1191PJ
Proposed 2026 3860-102-6093 (1) 3230 Budget Act $4,459,000 Riverine Stewardship Program 06/30/2029 06/30/2031 B1191PJ

Projects Enacted Total: $1,000,000

Projects Proposed Total: $4,459,000


Summary for PRC §91032(c) - Riverine Stewardship Projects that Improve Climate Resiliency

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$5,915,000

Outyear Commitments:

$2,550,000

Balance:

$41,160,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(d)

Allocation: Santa Ana River Conservancy Program

Net Allocation: $24,812,000


Projects for the Santa Ana River Conservancy Program.


PRC §91032(d)

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 2 PRC §91032(d)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $150,000 Santa Ana River Conservancy Program 06/30/2026 06/30/2028 B1105PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $194,000 Santa Ana River Conservancy Program 06/30/2027 06/30/2029 B1105PD

Program Delivery Enacted Total: $150,000

Program Delivery Proposed Total: $194,000

PRC §91032(d)

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 2 PRC §91032(d)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $10,000,000 Santa Ana River Conservancy Program 06/30/2028 06/30/2030 B1105PJ

Projects Enacted Total: $10,000,000


Summary for PRC §91032(d) - Santa Ana River Conservancy Program

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$10,344,000

Outyear Commitments:

$0

Balance:

$14,468,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(e)

Allocation: Urban Streams Restoration Program

Net Allocation: $24,812,000


Multiple-benefit urban stream and river projects under the Urban Streams Restoration Program established pursuant to Section 7048 of the Water Code that protect and restore riparian habitats, improve climate resilience, enhance natural drainages, protect and restore watersheds, and provide public access.


PRC §91032(e)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91032(e)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-001-6093 (1) 3230 Budget Act $250,000 Urban Streams Restoration Program 06/30/2026 06/30/2028 B1192PD
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $300,000 Urban Streams Restoration Program 06/30/2027 06/30/2029 B1192PD

Program Delivery Enacted Total: $250,000

Program Delivery Proposed Total: $300,000

PRC §91032(e)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91032(e)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-102-6093 (1) 3230 Budget Act $1,000,000 Urban Streams Restoration Program 06/30/2028 06/30/2030 B1192PJ
Proposed 2026 3860-102-6093 (1) 3230 Budget Act $10,625,000 Urban Streams Restoration Program 06/30/2029 06/30/2031 B1192PJ

Projects Enacted Total: $1,000,000

Projects Proposed Total: $10,625,000


Summary for PRC §91032(e) - Urban Streams Restoration Program

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$12,175,000

Outyear Commitments:

$1,200,000

Balance:

$11,437,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(f)

Allocation: Wildlife Refuges and Wetland Habitat Improvement

Net Allocation: $24,812,000


Projects that improve conditions on wildlife refuges and wetland habitat areas. Projects may include the acquisition and delivery of water from willing sellers and water conveyance rights to achieve compliance with subsection (d) of Section 3406 of the federal Central Valley Project Improvement Act (Title 34 of Public Law 102-575) and the acquisition of water and conveyance rights for the Lower Klamath National Wildlife Refuge.


PRC §91032(f)

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91032(f)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $163,000 Wildlife Refuges and Wetland Habitat Areas 06/30/2026 06/30/2028 B1000PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $163,000 Wildlife Refuges and Wetland Improvement Program 06/30/2027 06/30/2029 B1000PD

Program Delivery Enacted Total: $163,000

Program Delivery Proposed Total: $163,000


Summary for PRC §91032(f) - Wildlife Refuges and Wetland Habitat Improvement

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$326,000

Outyear Commitments:

$652,000

Balance:

$23,834,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(g)

Allocation: Lower American River Conservancy Program

Net Allocation: $9,925,000


Projects for the Lower American River Conservancy Program


PRC §91032(g)

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 2 PRC §91032(g)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-103-6093 (1) 2710 Budget Act $3,000,000 Lower American River Conservancy Program 06/30/2028 06/30/2030 B1090PJ

Projects Enacted Total: $3,000,000


Summary for PRC §91032(g) - Lower American River Conservancy Program

Allocation:

$10,000,000

Statewide Bond Costs:

$75,000

Enacted/Proposed Total:

$3,000,000

Outyear Commitments:

$0

Balance:

$6,925,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(h)

Allocation: Coyote Valley Conservation Program

Net Allocation: $24,812,000


Protect and restore watersheds through the Coyote Valley Conservation Program in the County of Santa Clara.


PRC §91032(h)

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 2 PRC §91032(h)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $50,000 Coyote Valley Conservation Program 06/30/2026 06/30/2028 B1106PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $194,000 Coyote Valley Conservation Program 06/30/2027 06/30/2029 B1106PD

Program Delivery Enacted Total: $50,000

Program Delivery Proposed Total: $194,000

PRC §91032(h)

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 2 PRC §91032(h)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $3,000,000 Coyote Valley Conservation Program 06/30/2028 06/30/2030 B1106PJ
Proposed 2026 3760-101-6093 (1) 2805032 Budget Act $14,250,000 Coyote Valley Conservation Program 06/30/2029 06/30/2031 B1106PJ

Projects Enacted Total: $3,000,000

Projects Proposed Total: $14,250,000


Summary for PRC §91032(h) - Coyote Valley Conservation Program

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$17,494,000

Outyear Commitments:

$776,000

Balance:

$6,542,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(i)

Allocation: West Coyote Hills Program

Net Allocation: $24,812,000


Protect and restore watersheds through the West Coyote Hills Program.


PRC §91032(i)

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 2 PRC §91032(i)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $194,000 West Coyote Hills Program 06/30/2027 06/30/2029 B1107PD

Program Delivery Proposed Total: $194,000

PRC §91032(i)

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 2 PRC §91032(i)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3760-101-6093 (1) 2805032 Budget Act $23,062,000 West Coyote Hills Program 06/30/2029 06/30/2031 B1107PJ

Projects Proposed Total: $23,062,000


Summary for PRC §91032(i) - West Coyote Hills Program

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$23,256,000

Outyear Commitments:

$776,000

Balance:

$780,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(j)

Allocation: Cross-Border Rivers and Coastal Waters (Tijuana & New River)

Net Allocation: $49,625,000


Loans or grants for projects that will address water quality problems arising in the California-Mexico cross-border rivers and coastal waters. Funds may be made available under this subdivision for water quality projects in the Tijuana River Valley Watershed, as described in the Tijuana River Plan created pursuant to Section 71107, and for projects consistent with the New River Water Quality, Public Health, and River Parkway Development Program, as described in Section 71103.6.


PRC §91032(j)

Department: State Water Resources Control Board

Purpose Type: Program Delivery

Chapter 2 PRC §91032(j)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-006-6093 (1) 3560 Budget Act $400,000 Cross-Border Rivers and Coastal Waters (Tijuana & New River) 06/30/2026 06/30/2028 B1220PD
Proposed 2026 3940-006-6093 (1) 3560 Budget Act $675,000 Cross-Border Rivers and Coastal Waters (Tijuana & New River) 06/30/2027 06/30/2029 B1220PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $675,000

PRC §91032(j)

Department: State Water Resources Control Board

Purpose Type: Projects

Chapter 2 PRC §91032(j)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3940-106-6093 (1) 3560 Budget Act $46,151,000 Cross-Border Rivers and Coastal Waters (Tijuana & New River) 06/30/2028 06/30/2031 B1220PJ

Projects Enacted Total: $46,151,000


Summary for PRC §91032(j) - Cross-Border Rivers and Coastal Waters (Tijuana & New River)

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$47,226,000

Outyear Commitments:

$2,025,000

Balance:

$374,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91032(k)

Allocation: Clear Lake Watershed - Climate Resiliency and Protection

Net Allocation: $19,850,000


Projects to improve the climate resiliency of, or for the protection of, the Clear Lake Watershed.


PRC §91032(k)

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91032(k)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $130,000 Clear Lake Watershed 06/30/2026 06/30/2028 B1001PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $130,000 Clear Lake Watershed 06/30/2027 06/30/2029 B1001PD

Program Delivery Enacted Total: $130,000

Program Delivery Proposed Total: $130,000

PRC §91032(k)

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 2 PRC §91032(k)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $1,800,000 Clear Lake Watershed 06/30/2028 06/30/2030 B1001PJ
Proposed 2026 0540-101-6093 (1) 0320 Budget Act $15,250,000 Clear Lake Watershed 06/30/2029 06/30/2031 B1001PJ
Proposed 2026 0540-101-6093 (1) 0320 Budget Act $1,500,000 Hydrilla Survey Program - Grant to CDFA 06/30/2029 06/30/2031 B1001PJ

Projects Enacted Total: $1,800,000

Projects Proposed Total: $16,750,000


Summary for PRC §91032(k) - Clear Lake Watershed - Climate Resiliency and Protection

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$18,810,000

Outyear Commitments:

$520,000

Balance:

$520,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91033(a)

Allocation: Salton Sea Management Program 10-year plan

Net Allocation: $158,800,000


To implement the Salton Sea Management Program 10-year Plan, and any subsequent revisions to that plan, or any subsequent plans, to provide air quality, public health, and habitat benefits.


PRC §91033(a)

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91033(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $566,000 Salton Sea Management Program 06/30/2026 06/30/2028 B1002PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $185,000 Salton Sea Management Program 06/30/2027 06/30/2029 B1002PD

Program Delivery Enacted Total: $566,000

Program Delivery Proposed Total: $185,000

PRC §91033(a)

Department: California Department of Fish and Wildlife

Purpose Type: Program Delivery

Chapter 2 PRC §91033(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3600-007-6093 (1) 2590 Budget Act $1,674,000 Salton Sea Management Program 06/30/2027 06/30/2029 B1083PD

Program Delivery Proposed Total: $1,674,000

PRC §91033(a)

Department: Department of Water Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91033(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3860-001-6093 (1) 3230 Budget Act $1,284,000 Salton Sea Management Program 06/30/2027 06/30/2029 B1193PD

Program Delivery Proposed Total: $1,284,000

PRC §91033(a)

Department: Department of Water Resources

Purpose Type: Projects

Chapter 2 PRC §91033(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-301-6093 (1)(c) 0000958 Budget Act $141,848,000 Salton Sea Management Plan - Construction 06/30/2028 06/30/2030 B1193PJ
Enacted 2025 3860-301-6093 (1)(d) 0000958 Budget Act $250,000 Salton Sea Management Plan - Equipment 06/30/2028 06/30/2030 B1193PJ
Enacted 2025 3860-301-6093 (1)(b) 0000958 Budget Act $1,000 Salton Sea Management Plan - Preliminary Plans 06/30/2028 06/30/2030 B1193PJ
Enacted 2025 3860-301-6093 (1)(a) 0000958 Budget Act $5,500,000 Salton Sea Management Plan - Study 06/30/2028 06/30/2030 B1193PJ
Enacted 2025 3860-301-6093 (1)(e) 0000958 Budget Act $1,000 Salton Sea Management Plan - Various 06/30/2028 06/30/2030 B1193PJ

Projects Enacted Total: $147,600,000


Summary for PRC §91033(a) - Salton Sea Management Program 10-year plan

Allocation:

$160,000,000

Statewide Bond Costs:

$1,200,000

Enacted/Proposed Total:

$151,309,000

Outyear Commitments:

$7,491,000

Balance:

$0


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91033(b)

Allocation: Salton Sea Conservancy

Net Allocation: $9,925,000


Creation of the Salton Sea Conservancy or to the Salton Sea Authority


PRC §91033(b)

Department: Salton Sea Conservancy

Purpose Type: Projects

Chapter 2 PRC §91033(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3815-001-6093 (1) 2970 Budget Act $1,638,000 Salton Sea Conservancy 06/30/2026 06/30/2028 B1140PJ
Proposed 2026 3815-001-6093 (1) 2970 Budget Act $3,224,000 Salton Sea Conservancy 06/30/2027 06/30/2029 B1140PJ

Projects Enacted Total: $1,638,000

Projects Proposed Total: $3,224,000


Summary for PRC §91033(b) - Salton Sea Conservancy

Allocation:

$10,000,000

Statewide Bond Costs:

$75,000

Enacted/Proposed Total:

$4,862,000

Outyear Commitments:

$5,063,000

Balance:

$0


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91040(a)

Allocation: Stream Flow Enhancement Program

Net Allocation: $99,250,000


Projects pursuant to the guidelines of the Stream Flow Enhancement Program, including the acquisition of water or water rights, acquisition of land that includes water rights or contractual rights to water, and short- or long-term water transfers and leases.


PRC §91040(a)

Department: Wildlife Conservation Board

Purpose Type: Program Delivery

Chapter 2 PRC §91040(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-002-6093 (1) 2710 Budget Act $500,000 Stream Flow Enhancement Program 06/30/2026 06/30/2028 B1091PD
Proposed 2026 3640-002-6093 (1) 2710 Budget Act $500,000 Stream Flow Enhancement Program 06/30/2027 06/30/2029 B1091PD

Program Delivery Enacted Total: $500,000

Program Delivery Proposed Total: $500,000

PRC §91040(a)

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 2 PRC §91040(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-104-6093 (1) 2710 Budget Act $20,000,000 Stream Flow Enhancement Program 06/30/2028 06/30/2030 B1091PJ
Proposed 2026 3640-104-6093 (1) 2710 Budget Act $10,000,000 Stream Flow Enhancement Program 06/30/2029 06/30/2031 B1091PJ

Projects Enacted Total: $20,000,000

Projects Proposed Total: $10,000,000


Summary for PRC §91040(a) - Stream Flow Enhancement Program

Allocation:

$100,000,000

Statewide Bond Costs:

$750,000

Enacted/Proposed Total:

$31,000,000

Outyear Commitments:

$2,000,000

Balance:

$66,250,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91040(b)

Allocation: Habitat Enhancement and Restoration Program

Net Allocation: $49,625,000


Habitat Enhancement and Restoration Program for fishery enhancement projects and programs that support reintroducing salmon into cold water habitat in the Sacramento and San Joaquin Rivers watersheds.


PRC §91040(b)

Department: Wildlife Conservation Board

Purpose Type: Program Delivery

Chapter 2 PRC §91040(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-002-6093 (1) 2710 Budget Act $500,000 Habitat Enhancement and Restoration Program 06/30/2026 06/30/2028 B1092PD
Proposed 2026 3640-002-6093 (1) 2710 Budget Act $500,000 Habitat Enhancement and Restoration Program (Fishery Enhancement) 06/30/2027 06/30/2029 B1092PD

Program Delivery Enacted Total: $500,000

Program Delivery Proposed Total: $500,000

PRC §91040(b)

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 2 PRC §91040(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-105-6093 (1) 2710 Budget Act $10,000,000 Habitat Enhancement and Restoration Program 06/30/2028 06/30/2030 B1092PJ

Projects Enacted Total: $10,000,000


Summary for PRC §91040(b) - Habitat Enhancement and Restoration Program

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$11,000,000

Outyear Commitments:

$1,500,000

Balance:

$37,125,000


Chapter 2

Safe Drinking Water, Drought, Flood, and Water Resilience

PRC §91045

Allocation: Nature and Climate Education

Net Allocation: $19,850,000


Grants to nature and climate education and research facilities, nonprofit organizations and public institutions, natural history museums, California zoos and aquariums accredited by the Association of Zoos and Aquariums, and geologic heritage sites that serve diverse populations. Grants may be used for buildings, equipment, structures, and exhibit galleries that present collections to promote climate, biodiversity, and cultural literacy. Projects may support species recovery and biodiversity protection in order to advance the state’s 30x30 conservation goal.


PRC §91045

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 2 PRC §91045
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $130,000 Nature, Climate Education, and Research Facility Grants 06/30/2026 06/30/2028 B1003PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $130,000 Nature, Climate Education, and Research Facility Grants 06/30/2027 06/30/2029 B1003PD

Program Delivery Enacted Total: $130,000

Program Delivery Proposed Total: $130,000

PRC §91045

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 2 PRC §91045
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $15,000,000 Geologic Heritage Sites 06/30/2028 06/30/2030 B1003PJ
Proposed 2026 0540-101-6093 (1) 0320 Budget Act $3,550,000 Nature, Climate Education, and Research Facility Grants 06/30/2029 06/30/2031 B1003PJ

Projects Enacted Total: $15,000,000

Projects Proposed Total: $3,550,000


Summary for PRC §91045 - Nature and Climate Education

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$18,810,000

Outyear Commitments:

$520,000

Balance:

$520,000


Summary for Chapter 2: Safe Drinking Water, Drought, Flood, and Water Resilience

Allocation:

$3,800,000,000

Statewide Bond Costs:

$28,498,000

Enacted/Proposed Total:

$1,991,471,000

Outyear Commitments:

$99,978,000

Balance:

$1,680,053,000

Enacted:

$1,199,489,000

Proposed:

$791,982,000


Chapter 3

Wildfire and Forest Resilience

PRC §91510

Allocation: Wildfire Mitigation Grant Program

Net Allocation: $133,987,000


For a wildfire mitigation grant program. The Office of Emergency Services shall coordinate with the Department of Forestry and Fire Protection in administering these moneys. The grant program shall assist local and state agencies to leverage additional funds, including matching grants from federal agencies. Funds may be used to provide loans, rebates, direct assistance, and matching funds for projects that prevent wildfires, increase resilience, maintain existing wildfire risk reduction projects, reduce the risk of wildfires to communities, or increase home or community hardening. Projects shall benefit disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91510

Department: Office of Emergency Services

Purpose Type: Program Delivery

Chapter 3 PRC §91510
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0690-008-6093 (1) 0385 Budget Act $1,050,000 Wildfire Mitigation Grant Program 06/30/2026 06/30/2028 B1030PD
Proposed 2026 0690-008-6093 (1) 0380 Budget Act $1,050,000 Wildfire Mitigation Grant Program 06/30/2027 06/30/2029 B1030PD

Program Delivery Enacted Total: $1,050,000

Program Delivery Proposed Total: $1,050,000

PRC §91510

Department: Office of Emergency Services

Purpose Type: Projects

Chapter 3 PRC §91510
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0690-108-6093 (1) 0385 Budget Act $11,950,000 Wildfire Mitigation Grant Program 06/30/2028 06/30/2030 B1030PJ
Proposed 2026 0690-108-6093 (1) 0380 Budget Act $25,000,000 Wildfire Mitigation Grant Program 06/30/2029 06/30/2031 B1030PJ

Projects Enacted Total: $11,950,000

Projects Proposed Total: $25,000,000


Summary for PRC §91510 - Wildfire Mitigation Grant Program

Allocation:

$135,000,000

Statewide Bond Costs:

$1,013,000

Enacted/Proposed Total:

$39,050,000

Outyear Commitments:

$4,200,000

Balance:

$90,737,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(a)

Allocation: Regional Forest and Fire Capacity Program

Net Allocation: $183,612,000


To increase regional capacity to prioritize, develop, and implement projects that improve forest health and fire resilience, implement community fire preparedness demonstration projects, facilitate greenhouse gas emissions reductions, and increase carbon sequestration in forests and other landscapes across regions and throughout the state. The funding shall be allocated based, to the extent feasible, on the Wildfire and Forest Resilience Action Plan.


PRC §91520(a)

Department: Department of Conservation

Purpose Type: Program Delivery

Chapter 3 PRC §91520(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-002-6093 (1) 2430 Budget Act $105,000 Regional Forest and Fire Capacity Program (RFFC) 06/30/2026 06/30/2028 B1056PD
Proposed 2026 3480-002-6093 (1) 2430 Budget Act $500,000 Regional Forest and Fire Capacity Program (RFFC) 06/30/2027 06/30/2029 B1056PD

Program Delivery Enacted Total: $105,000

Program Delivery Proposed Total: $500,000

PRC §91520(a)

Department: Department of Conservation

Purpose Type: Projects

Chapter 3 PRC §91520(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-102-6093 (1) 2430 Budget Act $10,000,000 Regional Forest and Fire Capacity Program (RFFC) 06/30/2028 06/30/2030 B1056PJ
Proposed 2026 3480-102-6093 (1) 2430 Budget Act $50,000,000 Regional Forest and Fire Capacity Program (RFFC) 06/30/2029 06/30/2031 B1056PJ

Projects Enacted Total: $10,000,000

Projects Proposed Total: $50,000,000


Summary for PRC §91520(a) - Regional Forest and Fire Capacity Program

Allocation:

$185,000,000

Statewide Bond Costs:

$1,388,000

Enacted/Proposed Total:

$60,605,000

Outyear Commitments:

$4,025,000

Balance:

$118,982,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(b)

Allocation: Regional Projects

Net Allocation: $168,725,000


Landscape-scale projects developed by forest collaboratives as defined in Section 4810, projects developed by regional entities as defined in Section 4208, and projects that implement strategies developed by state conservancies through block grants and direct appropriations by the Legislature.


PRC §91520(b)

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91520(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-001-6093 (1) 2470 Budget Act $1,107,000 Regional Fire Prevention and Forest Health 06/30/2026 06/30/2028 B1065PD
Proposed 2026 3540-001-6093 (1) 2470 Budget Act $904,000 Regional Projects to Improve Local Fire Prevention Capacity, Improve Forest Health and Resilience, Reduce Risk of Wildfire Spread 06/30/2027 06/30/2029 B1065PD

Program Delivery Enacted Total: $1,107,000

Program Delivery Proposed Total: $904,000

PRC §91520(b)

Department: Santa Monica Mountains Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-004-6093 (1) 2940 Budget Act $200,000 Regional Fire Prevention and Forest Health 06/30/2026 06/30/2028 B1138PD

Program Delivery Enacted Total: $200,000

PRC §91520(b)

Department: Sierra Nevada Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3855-001-6093 (1) 3220 Budget Act $50,000 Regional Fire Prevention and Forest Health 06/30/2026 06/30/2028 B1170PD
Proposed 2026 3855-001-6093 (1) 3220 Budget Act $250,000 Administration of Regional Projects 06/30/2027 06/30/2029 B1170PD

Program Delivery Enacted Total: $50,000

Program Delivery Proposed Total: $250,000

PRC §91520(b)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-101-6093 (1) 2470 Budget Act $30,000,000 Local Fire Prevention, Forest Health and Resilience, and Wildfire Risk Reduction 06/30/2028 06/30/2031 B1065PJ
Proposed 2026 3540-101-6093 (1) 2470 Budget Act $37,943,000 Local Fire Prevention, Forest Health and Resilience, and Wildfire Risk Reduction 06/30/2029 06/30/2032 B1065PJ

Projects Enacted Total: $30,000,000

Projects Proposed Total: $37,943,000

PRC §91520(b)

Department: Santa Monica Mountains Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-104-6093 (1) 2945 Budget Act $15,000,000 Regional Fire Prevention and Forest Health 06/30/2028 06/30/2031 B1138PJ

Projects Enacted Total: $15,000,000

PRC §91520(b)

Department: Sierra Nevada Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3855-101-6093 (1) 3220 Budget Act $45,000,000 Regional Fire Prevention and Forest Health 06/30/2028 06/30/2031 B1170PJ

Projects Enacted Total: $45,000,000


Summary for PRC §91520(b) - Regional Projects

Allocation:

$170,000,000

Statewide Bond Costs:

$1,275,000

Enacted/Proposed Total:

$130,454,000

Outyear Commitments:

$5,216,000

Balance:

$33,055,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(c)

Allocation: Forest Health Program

Net Allocation: $173,687,000


Program for long-term forest health projects, including improved forest management, prescribed fire, prescribed grazing, cultural fire, forest watershed restoration, reforestation, upper watershed, riparian, and mountain meadow restoration, and activities that promote long-term carbon storage and sequestration. Funds may be used for tribal wildfire resilience grants.


PRC §91520(c)

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91520(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-004-6093 (1) 2470 Budget Act $1,225,000 Forest Health Program 06/30/2026 06/30/2028 B1066PD
Proposed 2026 3540-004-6093 (1) 2470 Budget Act $1,400,000 Forest Health Program 06/30/2027 06/30/2029 B1066PD

Program Delivery Enacted Total: $1,225,000

Program Delivery Proposed Total: $1,400,000

PRC §91520(c)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3540-104-6093 (1) 2470 Budget Act $10,000,000 Forest Health Program 06/30/2028 06/30/2030 B1066PJ
Enacted 2025 3540-104-6093 (1) 2470 Budget Act $80,938,000 Forest Health Program 06/30/2028 06/30/2031 B1066PJ
Proposed 2026 3540-104-6093 (1) 2470 Budget Act $35,499,000 Forest Health Program 06/30/2029 06/30/2032 B1066PJ

Projects Enacted Total: $90,938,000

Projects Proposed Total: $35,499,000


Summary for PRC §91520(c) - Forest Health Program

Allocation:

$175,000,000

Statewide Bond Costs:

$1,313,000

Enacted/Proposed Total:

$129,062,000

Outyear Commitments:

$5,600,000

Balance:

$39,025,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(d)

Allocation: Local Fire Prevention Grants

Net Allocation: $183,612,000


Local fire prevention grants consistent with Article 2.5 (commencing with Section 4124) of Chapter 1 of Part 2 of Division 4 and for grants to conduct workforce development for fire prevention and wildfirer esiliency work. Workforce development grants may include, but are not limited to, the construction of designated housing for wildfire prevention workers.


PRC §91520(d)

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91520(d)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-003-6093 (1) 2465 Budget Act $100,000 Local Fire Prevention and Workforce Development 06/30/2026 06/30/2028 B1067PD
Enacted 2025 3540-003-6093 (2) 2470 Budget Act $1,000,000 Local Fire Prevention and Workforce Development 06/30/2026 06/30/2028 B1067PD
Proposed 2026 3540-003-6093 (1) 2465 Budget Act $1,319,000 Local Fire Prevention and Workforce Development 06/30/2027 06/30/2029 B1067PD
Proposed 2026 3540-003-6093 (2) 2470 Budget Act $1,000,000 Local Fire Prevention and Workforce Development 06/30/2027 06/30/2029 B1067PD

Program Delivery Enacted Total: $1,100,000

Program Delivery Proposed Total: $2,319,000

PRC §91520(d)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(d)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-103-6093 (1) 2465 Budget Act $70,000,000 Local Fire Prevention Grants 06/30/2028 06/30/2031 B1067PJ
Enacted 2025 3540-103-6093 (1) 2465 Budget Act $2,500,000 Workforce Development - California Conservation Corps 06/30/2028 06/30/2031 B1067PJ
Enacted 2025 3540-103-6093 (1) 2465 Budget Act $4,000,000 Workforce Development - Forestry and Fire Recruitment Program 06/30/2028 06/30/2031 B1067PJ
Enacted 2025 3540-103-6093 (1) 2465 Budget Act $1,500,000 Workforce Development - Future Fire Academy 06/30/2028 06/30/2031 B1067PJ
Enacted 2025 3540-103-6093 (1) 2465 Budget Act $2,000,000 Workforce Development - Local Conservation Corps 06/30/2028 06/30/2031 B1067PJ
Proposed 2026 3540-103-6093 (1) 2465 Budget Act $55,662,000 Local Fire Prevention and Workforce Development 06/30/2029 06/30/2032 B1067PJ

Projects Enacted Total: $80,000,000

Projects Proposed Total: $55,662,000


Summary for PRC §91520(d) - Local Fire Prevention Grants

Allocation:

$185,000,000

Statewide Bond Costs:

$1,388,000

Enacted/Proposed Total:

$139,081,000

Outyear Commitments:

$9,531,000

Balance:

$35,000,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(e)

Allocation: Fire Training Center

Net Allocation: $24,812,000


For the creation or expansion of a fire training center.


PRC §91520(e)

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91520(e)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3540-002-6093 (1) 2465 Budget Act $80,000 Fire Training Center 06/30/2029 06/30/2032 B1069PD

Program Delivery Proposed Total: $80,000

PRC §91520(e)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(e)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-102-6093 (1) 2465 Budget Act $2,500,000 Fire Training Center 06/30/2028 06/30/2031 B1069PJ
Proposed 2026 3540-002-6093 (1) 2465 Budget Act $4,920,000 Fire Training Center 06/30/2029 06/30/2032 B1069PJ

Projects Enacted Total: $2,500,000

Projects Proposed Total: $4,920,000


Summary for PRC §91520(e) - Fire Training Center

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$7,500,000

Outyear Commitments:

$240,000

Balance:

$17,072,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(f)

Allocation: Forest Health and Watershed Improvement Projects

Net Allocation: $198,500,000


For forest health and watershed improvement projects in forests and other habitats, including, but not limited to, redwoods, conifers, oak woodlands, mountain meadows, chaparral, and coastal forests. Projects shall involve the restoration of natural ecosystem functions in very high, high, and moderate fire hazard areas and may include prescribed fire, cultural fire, environmentally sensitive vegetation management, land protection, science-based fuel reduction, watershed protection, carbon sequestration, protection of older fire-resistant trees, or improved forest health.


PRC §91520(f)

Department: California State Parks

Purpose Type: Program Delivery

Chapter 3 PRC §91520(f)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-001-6093 (1) 2840 Budget Act $400,000 Stewardship of State-Owned Lands (Wildfire Resilience) 06/30/2026 06/30/2028 B1120PD
Proposed 2026 3790-001-6093 (1) 2840 Budget Act $400,000 Stewardship of State-Owned Lands (Wildfire Resilience) 06/30/2027 06/30/2029 B1120PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $400,000

PRC §91520(f)

Department: California State Parks

Purpose Type: Projects

Chapter 3 PRC §91520(f)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-003-6093 (1) 2840 Budget Act $33,000,000 Stewardship of State-Owned Lands (Wildfire Resilience) 06/30/2030 06/30/2032 B1120PJ
Proposed 2026 3790-003-6093 (1) 2840 Budget Act $33,000,000 Stewardship of State-Owned Lands (Wildfire Resilience) 06/30/2031 06/30/2033 B1120PJ

Projects Enacted Total: $33,000,000

Projects Proposed Total: $33,000,000


Summary for PRC §91520(f) - Forest Health and Watershed Improvement Projects

Allocation:

$200,000,000

Statewide Bond Costs:

$1,500,000

Enacted/Proposed Total:

$66,800,000

Outyear Commitments:

$1,600,000

Balance:

$130,100,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(g)

Allocation: Fuel Reduction, Structure Hardening, Defensible space, Reforestation, or Targeted Acquisitions to Improve Forest Health and Fire Resilience

Net Allocation: $49,625,000


Grants to conduct fuel reduction, structure hardening, create defensible space, reforestation, or targeted acquisitions to improve forest health and fire resilience.


PRC §91520(g)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(g)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-105-6093 (1) 2470 Budget Act $20,000,000 Grants for Fuel Reduction and Other Purposes in Southern Californian Counties 06/30/2028 06/30/2031 B1070PJ
Enacted 2025 3540-105-6093 (1) 2470 Budget Act $10,000,000 Grants for Fuel Reduction and Other Purposes, unspecified locations 06/30/2028 06/30/2031 B1070PJ
Proposed 2026 3540-105-6093 (1) 2465 Budget Act $4,975,000 Wildfire Prevention, Forest Legacy, and Wildfire Resilience 06/30/2029 06/30/2032 B1070PJ
Proposed 2026 3540-105-6093 (2) 2470 Budget Act $14,650,000 Wildfire Prevention, Forest Legacy, and Wildfire Resilience 06/30/2029 06/30/2032 B1070PJ

Projects Enacted Total: $30,000,000

Projects Proposed Total: $19,625,000


Summary for PRC §91520(g) - Fuel Reduction, Structure Hardening, Defensible space, Reforestation, or Targeted Acquisitions to Improve Forest Health and Fire Resilience

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$49,625,000

Outyear Commitments:

$0

Balance:

$0


Chapter 3

Wildfire and Forest Resilience

PRC §91520(h)

Allocation: Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development

Net Allocation: $33,249,000


Watershed improvement, forest health, biomass utilization, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91520(h)

Department: Sierra Nevada Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(h)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3855-002-6093 (1) 3220 Budget Act $50,000 Forest and Watershed 06/30/2026 06/30/2028 B1171PD
Proposed 2025 3855-002-6093 (1) 3220 Budget Drill Adjustments $1,000 Forest and Watershed: Control Section Adjustments 06/30/2026 06/30/2028 B1171PD
Proposed 2026 3855-002-6093 (1) 3220 Budget Act $41,000 Forest and Watershed 06/30/2027 06/30/2029 B1171PD

Program Delivery Enacted Total: $50,000

Program Delivery Proposed Total: $42,000

PRC §91520(h)

Department: Sierra Nevada Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(h)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3855-102-6093 (1) 3220 Budget Act $30,904,000 Forest and Watershed 06/30/2028 06/30/2030 B1171PJ

Projects Enacted Total: $30,904,000


Summary for PRC §91520(h) - Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development

Allocation:

$33,500,000

Statewide Bond Costs:

$251,000

Enacted/Proposed Total:

$30,996,000

Outyear Commitments:

$656,000

Balance:

$1,597,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(i)

Allocation: Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development

Net Allocation: $25,309,000


Watershed improvement, forest health, biomass utilization, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91520(i)

Department: California Tahoe Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(i)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3125-001-6093 (1) 2340 Budget Act $150,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2026 06/30/2028 B1035PD
Proposed 2026 3125-001-6093 (1) 2340 Budget Act $150,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2027 06/30/2029 B1035PD

Program Delivery Enacted Total: $150,000

Program Delivery Proposed Total: $150,000

PRC §91520(i)

Department: California Tahoe Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(i)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3125-101-6093 (1) 2340 Budget Act $23,524,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2028 06/30/2030 B1035PJ

Projects Enacted Total: $23,524,000


Summary for PRC §91520(i) - Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development

Allocation:

$25,500,000

Statewide Bond Costs:

$191,000

Enacted/Proposed Total:

$23,824,000

Outyear Commitments:

$1,400,000

Balance:

$85,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(j)

Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Net Allocation: $33,249,000


Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91520(j)

Department: Santa Monica Mountains Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(j)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-002-6093 (1) 2940 Budget Act $400,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2026 06/30/2028 B1136PD
Proposed 2026 3810-002-6093 (1) 2940 Budget Act $400,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2027 06/30/2029 B1136PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $400,000

PRC §91520(j)

Department: Santa Monica Mountains Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(j)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3810-102-6093 (1) 2945 Budget Act $31,349,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2028 06/30/2030 B1136PJ

Projects Enacted Total: $31,349,000


Summary for PRC §91520(j) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Allocation:

$33,500,000

Statewide Bond Costs:

$251,000

Enacted/Proposed Total:

$32,149,000

Outyear Commitments:

$1,100,000

Balance:

$0


Chapter 3

Wildfire and Forest Resilience

PRC §91520(k)

Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Net Allocation: $33,249,000


Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91520(k)

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(k)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2790 Budget Act $261,000 Wildfire Resilience 06/30/2026 06/30/2028 B1108PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $261,000 Wildfire Resilience 06/30/2027 06/30/2029 B1108PD

Program Delivery Enacted Total: $261,000

Program Delivery Proposed Total: $261,000

PRC §91520(k)

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(k)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3760-101-6093 (1) 2805032 Budget Act $30,904,000 Wildfire Resilience 06/30/2028 06/30/2030 B1108PJ

Projects Enacted Total: $30,904,000


Summary for PRC §91520(k) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Allocation:

$33,500,000

Statewide Bond Costs:

$251,000

Enacted/Proposed Total:

$31,426,000

Outyear Commitments:

$1,044,000

Balance:

$779,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(l)

Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Net Allocation: $33,249,000


Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91520(l)

Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(l)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3825-002-6093 (1) 2990 Budget Act $200,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2026 06/30/2028 B1146PD
Proposed 2026 3825-002-6093 (1) 2990 Budget Act $400,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2027 06/30/2029 B1146PD

Program Delivery Enacted Total: $200,000

Program Delivery Proposed Total: $400,000

PRC §91520(l)

Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(l)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3825-102-6093 (1) 2990 Budget Act $30,904,000 Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development 06/30/2028 06/30/2030 B1146PJ

Projects Enacted Total: $30,904,000


Summary for PRC §91520(l) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Allocation:

$33,500,000

Statewide Bond Costs:

$251,000

Enacted/Proposed Total:

$31,504,000

Outyear Commitments:

$1,545,000

Balance:

$200,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(m)

Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Net Allocation: $25,309,000


Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.


PRC §91520(m)

Department: San Diego River Conservancy

Purpose Type: Program Delivery

Chapter 3 PRC §91520(m)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3845-001-6093 (1) 3140 Budget Act $40,000 Wildfire and Forest Resilience 06/30/2026 06/30/2028 B1160PD
Proposed 2026 3845-001-6093 (1) 3140 Budget Act $200,000 Wildfire and Forest Resilience 06/30/2027 06/30/2029 B1160PD

Program Delivery Enacted Total: $40,000

Program Delivery Proposed Total: $200,000

PRC §91520(m)

Department: San Diego River Conservancy

Purpose Type: Projects

Chapter 3 PRC §91520(m)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2024 3845-101-6093 (1) 3140 Budget Act $23,524,000 Wildfire and Forest Resilience 06/30/2028 06/30/2030 B1160PJ

Projects Enacted Total: $23,524,000


Summary for PRC §91520(m) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development

Allocation:

$25,500,000

Statewide Bond Costs:

$191,000

Enacted/Proposed Total:

$23,764,000

Outyear Commitments:

$800,000

Balance:

$745,000


Chapter 3

Wildfire and Forest Resilience

PRC §91520(n)

Allocation: Improve Firefighter Health and Safety, Advance Fire Attack Effectiveness, and Promote Community Resilience and Awareness

Net Allocation: $14,887,000


Improve firefighter healthand safety, advance fire attack effectiveness, and promote community resilience and awareness.


PRC §91520(n)

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91520(n)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-007-6093 (1) 2470 Budget Act $200,000 Wildfire Conservancy 06/30/2026 06/30/2028 B1073PD
Proposed 2026 3540-007-6093 (1) 2470 Budget Act $200,000 Wildfire Conservancy 06/30/2027 06/30/2029 B1073PD

Program Delivery Enacted Total: $200,000

Program Delivery Proposed Total: $200,000

PRC §91520(n)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(n)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-107-6093 (1) 2470 Budget Act $13,837,000 Wildfire Conservancy 06/30/2026 06/30/2028 B1073PJ

Projects Enacted Total: $13,837,000


Summary for PRC §91520(n) - Improve Firefighter Health and Safety, Advance Fire Attack Effectiveness, and Promote Community Resilience and Awareness

Allocation:

$15,000,000

Statewide Bond Costs:

$113,000

Enacted/Proposed Total:

$14,237,000

Outyear Commitments:

$650,000

Balance:

$0


Chapter 3

Wildfire and Forest Resilience

PRC §91520(o)

Allocation: Vegetation Mitigation, Fuels Reduction, Public Education and Outreach, Personal Protective Equipment, Specialized Firefighting Equipment, and Firefighter Health and Safety

Net Allocation: $14,887,000


Support vegetation mitigation and fuels reduction projects, public education and outreach, personal protective equipment, specialized firefighting equipment, and firefighter health and safety.


PRC §91520(o)

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91520(o)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-008-6093 (1) 2470 Budget Act $200,000 California Fire Foundation 06/30/2026 06/30/2028 B1074PD
Proposed 2026 3540-008-6093 (1) 2470 Budget Act $200,000 California Fire Foundation 06/30/2027 06/30/2029 B1074PD

Program Delivery Enacted Total: $200,000

Program Delivery Proposed Total: $200,000

PRC §91520(o)

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91520(o)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-108-6093 (1) 2470 Budget Act $13,837,000 California Fire Foundation 06/30/2026 06/30/2028 B1074PJ

Projects Enacted Total: $13,837,000


Summary for PRC §91520(o) - Vegetation Mitigation, Fuels Reduction, Public Education and Outreach, Personal Protective Equipment, Specialized Firefighting Equipment, and Firefighter Health and Safety

Allocation:

$15,000,000

Statewide Bond Costs:

$113,000

Enacted/Proposed Total:

$14,237,000

Outyear Commitments:

$650,000

Balance:

$0


Chapter 3

Wildfire and Forest Resilience

PRC §91530

Allocation: Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses

Net Allocation: $49,625,000


Projects in California that provide long-term capital infrastructure to use forest and other vegetative waste removed for wildfire mitigation for noncombustible uses that maximize reductions in greenhouse gas emissions, provide local air quality benefits, and increase local community resilience against climate change impacts.


PRC §91530

Department: Department of Conservation

Purpose Type: Program Delivery

Chapter 3 PRC §91530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-003-6093 (1) 2430 Budget Act $630,000 Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses 06/30/2026 06/30/2028 B1057PD
Proposed 2026 3480-003-6093 (1) 2430 Budget Act $407,000 Forest Biomass to Carbon Negative Biofuels 06/30/2027 06/30/2029 B1057PD

Program Delivery Enacted Total: $630,000

Program Delivery Proposed Total: $407,000

PRC §91530

Department: Department of Conservation

Purpose Type: Projects

Chapter 3 PRC §91530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-103-6093 (1) 2430 Budget Act $10,000,000 Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses 06/30/2028 06/30/2030 B1057PJ
Proposed 2026 3480-103-6093 (1) 2430 Budget Act $15,000,000 Use Forest/Vegetative Waste for Noncombustible Uses 06/30/2029 06/30/2031 B1057PJ

Projects Enacted Total: $10,000,000

Projects Proposed Total: $15,000,000


Summary for PRC §91530 - Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$26,037,000

Outyear Commitments:

$1,250,000

Balance:

$22,338,000


Chapter 3

Wildfire and Forest Resilience

PRC §91535

Allocation: Fire Ignition Detection Technology

Net Allocation: $24,812,000


Technologies that improve detection and assessment of new fire ignitions.


PRC §91535

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91535
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-009-6093 (1) 2465 Budget Act $200,000 Technologies for Detection and Assessment of New Fire Ignitions 06/30/2028 06/30/2031 B1071PD

Program Delivery Enacted Total: $200,000

PRC §91535

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91535
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-009-6093 (1) 2465 Budget Act $5,000,000 AlertCalifornia for Wildfire Detection Camera-Related Technology 06/30/2028 06/30/2031 B1071PJ
Enacted 2025 3540-009-6093 (1) 2465 Budget Act $16,812,000 Low Earth Orbit Satellite Technology 06/30/2028 06/30/2031 B1071PJ
Enacted 2025 3540-009-6093 (1) 2465 Budget Act $1,250,000 Study Related to the Use of Autonomous Aircraft 06/30/2028 06/30/2031 B1071PJ
Proposed 2026 3540-009-6093 (1) 2465 Budget Act $1,550,000 Technologies that Improve Detection and Assessment of New Fire Ignitions 06/30/2028 06/30/2031 B1071PJ

Projects Enacted Total: $23,062,000

Projects Proposed Total: $1,550,000


Summary for PRC §91535 - Fire Ignition Detection Technology

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$24,812,000

Outyear Commitments:

$0

Balance:

$0


Chapter 3

Wildfire and Forest Resilience

PRC §91540

Allocation: Reduce Wildfire Risk Related to Electricity Transmission

Net Allocation: $34,737,000


Uses to reduce wildfire risk related to electricity transmission. The proportion of any asset funded pursuant to this section shall be funded without return on equity for the lifetime of the proportion of that asset that would have otherwise been borne by ratepayers. The proportion of any projects funded pursuant to this section shall be excluded from the ratebase, and no costs may be collected from ratepayers.


PRC §91540

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 3 PRC §91540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3540-010-6093 (1) 2465 Budget Act $243,000 Reduce Wildfire Risk Related to Electricity Transmission 06/30/2027 06/30/2029 B1075PD

Program Delivery Proposed Total: $243,000

PRC §91540

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 3 PRC §91540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3540-110-6093 (1) 2465 Budget Act $15,000,000 Reduce Wildfire Risk Related to Electricity Transmission 06/30/2029 06/30/2032 B1075PJ

Projects Proposed Total: $15,000,000


Summary for PRC §91540 - Reduce Wildfire Risk Related to Electricity Transmission

Allocation:

$35,000,000

Statewide Bond Costs:

$263,000

Enacted/Proposed Total:

$15,243,000

Outyear Commitments:

$968,000

Balance:

$18,526,000


Chapter 3

Wildfire and Forest Resilience

PRC §91545(a)

Allocation: Demonstrated Jobs Projects

Net Allocation: $19,850,000


Demonstrated jobs projects and grants, including either of the following: (1) Projects to mitigate unemployment and assist the state with the implementation of critical natural resources, transportation, energy, and housing infrastructure to promote climate resilience; (2) Projects to prepare for, prevent, respond to, and rehabilitate following natural disasters, declared emergencies, or climate-related impacts to communities.


PRC §91545(a)

Department: California Conservation Corps

Purpose Type: Projects

Chapter 3 PRC §91545(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3340-101-6093 (1) 2360 Budget Act $1,493,000 Tribal Corps / Nonprofit Youth Grants 06/30/2027 06/30/2029 B1041PJ

Projects Proposed Total: $1,493,000


Summary for PRC §91545(a) - Demonstrated Jobs Projects

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$1,493,000

Outyear Commitments:

$2,334,000

Balance:

$16,023,000


Chapter 3

Wildfire and Forest Resilience

PRC §91545(b)

Allocation: Demonstrated Jobs Projects for Certified Community Conservation Corps

Net Allocation: $29,775,000


Demonstrated Jobs Projects for certified community conservation corps, as defined in Section 14507.5.


PRC §91545(b)

Department: California Conservation Corps

Purpose Type: Program Delivery

Chapter 3 PRC §91545(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3340-001-6093 (1) 2360 Budget Act $200,000 Certified Community Conservation Corps 06/30/2026 06/30/2028 B1042PD
Proposed 2026 3340-001-6093 (1) 2360 Budget Act $200,000 Certified Community Conservation Corps 06/30/2027 06/30/2029 B1042PD

Program Delivery Enacted Total: $200,000

Program Delivery Proposed Total: $200,000

PRC §91545(b)

Department: California Conservation Corps

Purpose Type: Projects

Chapter 3 PRC §91545(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3340-101-6093 (1) 2360 Budget Act $9,949,000 Certified Community Conservation Corps Grants 06/30/2028 06/30/2030 B1042PJ
Proposed 2026 3340-101-6093 (1) 2360 Budget Act $9,949,000 Certified Community Conservation Corps Grants 06/30/2029 06/30/2031 B1042PJ

Projects Enacted Total: $9,949,000

Projects Proposed Total: $9,949,000


Summary for PRC §91545(b) - Demonstrated Jobs Projects for Certified Community Conservation Corps

Allocation:

$30,000,000

Statewide Bond Costs:

$225,000

Enacted/Proposed Total:

$20,298,000

Outyear Commitments:

$765,000

Balance:

$8,712,000


Summary for Chapter 3: Wildfire and Forest Resilience

Allocation:

$1,500,000,000

Statewide Bond Costs:

$11,253,000

Enacted/Proposed Total:

$912,197,000

Outyear Commitments:

$43,574,000

Balance:

$532,976,000

Enacted:

$597,950,000

Proposed:

$314,247,000


Chapter 4

Coastal Resilience

PRC §92010(a)

Allocation: Coastal resilience project and programs

Net Allocation: $327,525,000


Projects identified by the State Coastal Conservancy for coastal resilience projects and programs, including, but not limited to, grants and expenditures to protect, restore, and increase the resilience of beaches, bays, coastal dunes, wetlands, coastal forests, watersheds, trails, and public access facilities.


PRC §92010(a)

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 4 PRC §92010(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $900,000 Coastal Resilience 06/30/2026 06/30/2028 B1109PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $2,222,000 Coastal Resilience 06/30/2027 06/30/2029 B1109PD

Program Delivery Enacted Total: $900,000

Program Delivery Proposed Total: $2,222,000

PRC §92010(a)

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 4 PRC §92010(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $54,000,000 Coastal Resilience 06/30/2028 06/30/2030 B1109PJ
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $5,000,000 Coastal Resilience - Native Steelhead Trout Populations 06/30/2028 06/30/2030 B1109PJ
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $3,000,000 Coastal Resilience - Restoration and Enhancement of Native Oyster Beds 06/30/2028 06/30/2030 B1109PJ
Proposed 2026 3760-101-6093 (1) 2805032 Budget Act $30,835,000 Coastal Resilience 06/30/2029 06/30/2031 B1109PJ

Projects Enacted Total: $62,000,000

Projects Proposed Total: $30,835,000


Summary for PRC §92010(a) - Coastal resilience project and programs

Allocation:

$330,000,000

Statewide Bond Costs:

$2,475,000

Enacted/Proposed Total:

$95,957,000

Outyear Commitments:

$8,888,000

Balance:

$222,680,000


Chapter 4

Coastal Resilience

PRC §92010(b)

Allocation: San Francisco Bay Restoration Authority Act/SF Bay Conservancy Program

Net Allocation: $84,362,000


Projects that are consistent with the San Francisco Bay Restoration Authority Act (Title 7.25 (commencing with Section 66700) of the Government Code) or the San Francisco Bay Area Conservancy Program established pursuant to Chapter 4.5 (commencing with Section 31160) of Division 21, including, but not limited to, projects that address sea level rise, flood management, and wetland restoration.


PRC §92010(b)

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 4 PRC §92010(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $560,000 Coastal Resilience - San Francisco Bay 06/30/2026 06/30/2028 B1110PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $661,000 Coastal Resilience – San Francisco Bay 06/30/2027 06/30/2029 B1110PD

Program Delivery Enacted Total: $560,000

Program Delivery Proposed Total: $661,000

PRC §92010(b)

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 4 PRC §92010(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $40,000,000 San Francisco Bay Restoration Authority Act or San Francisco Bay Area Conservancy Program 06/30/2028 06/30/2030 B1110PJ

Projects Enacted Total: $40,000,000


Summary for PRC §92010(b) - San Francisco Bay Restoration Authority Act/SF Bay Conservancy Program

Allocation:

$85,000,000

Statewide Bond Costs:

$638,000

Enacted/Proposed Total:

$41,221,000

Outyear Commitments:

$2,644,000

Balance:

$40,497,000


Chapter 4

Coastal Resilience

PRC §92015

Allocation: Coastal and Combined Flood Management Projects and Activities for Developed Shoreline Areas

Net Allocation: $347,375,000


Funds shall be allocated to multiple-benefit projects that improve public safety, including shoreline resilience projects designed to address flooding, sea level rise, and shoreline stability that include engineering with nature or nature-based features. These funds shall be available to local agencies as matching funds for federally funded coastal flood risk management and flood risk management projects.


PRC §92015

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 4 PRC §92015
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $460,000 Coastal and Combined Flood Management for Developed Shoreline Areas 06/30/2026 06/30/2028 B1111PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $2,224,000 Coastal and Combined Flood Management for Developed Shoreline Areas 06/30/2027 06/30/2029 B1111PD

Program Delivery Enacted Total: $460,000

Program Delivery Proposed Total: $2,224,000

PRC §92015

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 4 PRC §92015
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $32,835,000 Coastal and Combined Flood Management for Developed Shoreline Areas 06/30/2028 06/30/2030 B1111PJ

Projects Enacted Total: $32,835,000


Summary for PRC §92015 - Coastal and Combined Flood Management Projects and Activities for Developed Shoreline Areas

Allocation:

$350,000,000

Statewide Bond Costs:

$2,625,000

Enacted/Proposed Total:

$35,519,000

Outyear Commitments:

$8,890,000

Balance:

$302,966,000


Chapter 4

Coastal Resilience

PRC §92020

Allocation: Increase Ocean and Coastal Resilience from Impacts of Climate Change

Net Allocation: $133,987,000


Deposit into the Ocean Protection Trust Fund for grants to increase resilience from the impacts of climate change.


PRC §92020

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 4 PRC §92020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-002-6093 (1) 0320 Budget Act $250,000 Increase Ocean & Coastal Resilience from Impacts of Climate Change 06/30/2026 06/30/2028 B1020PD
Proposed 2026 0540-002-6093 (1) 0320 Budget Act $200,000 Increase Ocean & Coastal Resilience from Impacts of Climate Change 06/30/2027 06/30/2029 B1020PD

Program Delivery Enacted Total: $250,000

Program Delivery Proposed Total: $200,000

PRC §92020

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 4 PRC §92020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-102-6093 (1) 0320 Budget Act $3,000,000 Improve Working Waterfront Infrastructure along the North Coast 06/30/2028 06/30/2030 B1020PJ
Enacted 2025 0540-102-6093 (1) 0320 Budget Act $7,500,000 Increase Resilience from Impacts of Climage Change 06/30/2028 06/30/2030 B1020PJ
Enacted 2025 0540-102-6093 (1) 0320 Budget Act $12,000,000 Recover Rocky Reef and Kelp Forest Habitats 06/30/2028 06/30/2030 B1020PJ
Proposed 2026 0540-102-6093 (1) 0320 Budget Act $15,000,000 Increase Resilience from Impacts of Climate Change 06/30/2029 06/30/2031 B1020PJ

Projects Enacted Total: $22,500,000

Projects Proposed Total: $15,000,000


Summary for PRC §92020 - Increase Ocean and Coastal Resilience from Impacts of Climate Change

Allocation:

$135,000,000

Statewide Bond Costs:

$1,013,000

Enacted/Proposed Total:

$37,950,000

Outyear Commitments:

$3,750,000

Balance:

$92,287,000


Chapter 4

Coastal Resilience

PRC §92030

Allocation: Sea Level Rise Mitigation and Adaptation

Net Allocation: $74,437,000


Implement the California Sea Level Rise Mitigation and Adaptation Act of 2021 (Division 20.6.5 (commencing with Section 30970)).


PRC §92030

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 4 PRC §92030
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-002-6093 (1) 0320 Budget Act $250,000 Sea Level Rise Mitigation and Adaptation 06/30/2026 06/30/2028 B1021PD
Proposed 2026 0540-002-6093 (1) 0320 Budget Act $500,000 Sea Level Rise Adaptation Planning Grant Program 06/30/2027 06/30/2029 B1021PD

Program Delivery Enacted Total: $250,000

Program Delivery Proposed Total: $500,000

PRC §92030

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 4 PRC §92030
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-102-6093 (1) 0320 Budget Act $20,000,000 Sea Level Rise Mitigation and Adaptation 06/30/2028 06/30/2030 B1021PJ
Proposed 2026 0540-102-6093 (1) 0320 Budget Act $25,000,000 Sea Level Rise Mitigation and Adaptation Act 06/30/2029 06/30/2031 B1021PJ

Projects Enacted Total: $20,000,000

Projects Proposed Total: $25,000,000


Summary for PRC §92030 - Sea Level Rise Mitigation and Adaptation

Allocation:

$75,000,000

Statewide Bond Costs:

$563,000

Enacted/Proposed Total:

$45,750,000

Outyear Commitments:

$2,350,000

Balance:

$26,337,000


Chapter 4

Coastal Resilience

PRC §92040

Allocation: Sea Level Rise Adaptation Strategy

Net Allocation: $49,625,000


Implement the Sea Level Rise Adaptation Strategy to address the impacts of sea level rise in coastal state parks, support continued access and recreational opportunities, and protect coastal natural and cultural resources.


PRC §92040

Department: California State Parks

Purpose Type: Program Delivery

Chapter 4 PRC §92040
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-001-6093 (1) 2840 Budget Act $250,000 Sea Level Rise Adaptation Strategy 06/30/2026 06/30/2028 B1121PD
Proposed 2026 3790-001-6093 (1) 2840 Budget Act $250,000 Sea Level Rise Adaptation Strategy 06/30/2027 06/30/2029 B1121PD

Program Delivery Enacted Total: $250,000

Program Delivery Proposed Total: $250,000

PRC §92040

Department: California State Parks

Purpose Type: Projects

Chapter 4 PRC §92040
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-003-6093 (1) 2840 Budget Act $23,750,000 Sea Level Rise Adaptation Strategy 06/30/2030 06/30/2032 B1121PJ

Projects Enacted Total: $23,750,000


Summary for PRC §92040 - Sea Level Rise Adaptation Strategy

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$24,250,000

Outyear Commitments:

$1,000,000

Balance:

$24,375,000


Chapter 4

Coastal Resilience

PRC §92050

Allocation: Island Ecosystems, Climate-Ready Fisheries Management, and Kelp Ecosystems

Net Allocation: $74,437,000


Projects for all of the following: a) To protect and restore island ecosystems by mitigating the threat of island invasive species and advancing biosecurity initiatives. (b) To advance climate-ready fisheries management by expanding opportunities for experimentation and adaptive cooperative management, modernizing electronic fisheries data management systems, and increasing the use of electronic technologies to facilitate more nimble decisionmaking and timely management responses under changing ocean conditions. (c) To support the restoration and management of kelp ecosystems.


PRC §92050

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 4 PRC §92050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-002-6093 (1) 0320 Budget Act $170,000 Restoration and Management of Kelp Ecosystems 06/30/2026 06/30/2028 B1022PD

Program Delivery Enacted Total: $170,000

PRC §92050

Department: California Department of Fish and Wildlife

Purpose Type: Program Delivery

Chapter 4 PRC §92050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3600-001-6093 (1) 2590 Budget Act $774,000 Island Ecosystems, Climate-Ready Fisheries Management, Kelp Ecosystems 06/30/2030 06/30/2032 B1080PD
Proposed 2026 3600-001-6093 (1) 2590 Budget Act $886,000 Restoration of Kelp and Island Ecosystems 06/30/2027 06/30/2029 B1080PD

Program Delivery Enacted Total: $774,000

Program Delivery Proposed Total: $886,000

PRC §92050

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 4 PRC §92050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-102-6093 (1) 0320 Budget Act $5,000,000 Protect and Restore Island Ecosystems 06/30/2028 06/30/2030 B1022PJ
Enacted 2025 0540-102-6093 (1) 0320 Budget Act $7,000,000 Restoration and Management of Kelp Ecosystems 06/30/2028 06/30/2030 B1022PJ

Projects Enacted Total: $12,000,000

PRC §92050

Department: California Department of Fish and Wildlife

Purpose Type: Projects

Chapter 4 PRC §92050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3600-002-6093 (1) 2590 Budget Act $22,850,000 Island Ecosystems, Climate-Ready Fisheries Management, Kelp Ecosystems 06/30/2028 06/30/2030 B1080PJ
Enacted 2025 3600-102-6093 (1) 2590 Budget Act $1,000 Island Ecosystems, Climate-Ready Fisheries Management, Kelp Ecosystems 06/30/2028 06/30/2030 B1080PJ
Proposed 2026 3600-002-6093 (1) 2590 Budget Act $9,313,000 Restoration of Kelp and Island Ecosystems 06/30/2029 06/30/2031 B1080PJ
Proposed 2026 3600-102-6093 (1) 2590 Budget Act $1,000 Restoration of Kelp and Island Ecosystems 06/30/2029 06/30/2031 B1080PJ

Projects Enacted Total: $22,851,000

Projects Proposed Total: $9,314,000


Summary for PRC §92050 - Island Ecosystems, Climate-Ready Fisheries Management, and Kelp Ecosystems

Allocation:

$75,000,000

Statewide Bond Costs:

$563,000

Enacted/Proposed Total:

$45,995,000

Outyear Commitments:

$2,658,000

Balance:

$25,784,000


Chapter 4

Coastal Resilience

PRC §92060

Allocation: Dam Removal and Related Water Infrastructure

Net Allocation: $74,437,000


Grants or expenditures to remove outdated or obsolete dams and for related water infrastructure. Projects may also increase climate resilience, enhance sediment supply, improve wildlife and fish passage, and modernize related water infrastructure, including related planning, monitoring, permitting, habitat restoration, and recreational improvements.


PRC §92060

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 4 PRC §92060
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $600,000 Dam Removal and Related Water Infrastructure 06/30/2026 06/30/2028 B1112PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $583,000 Dam Removal and Related Water Infrastructure 06/30/2027 06/30/2029 B1112PD

Program Delivery Enacted Total: $600,000

Program Delivery Proposed Total: $583,000

PRC §92060

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 4 PRC §92060
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $5,500,000 Fish Passage Barrier Removal and Habitat Restoration for Potter Valley Project 06/30/2028 06/30/2030 B1112PJ
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $20,000,000 Matilija Dam Removal 06/30/2028 06/30/2030 B1112PJ
Enacted 2025 3760-101-6093 (1) 2805032 Budget Act $8,500,000 Remove Outdated or Obsolete Dams 06/30/2028 06/30/2030 B1112PJ

Projects Enacted Total: $34,000,000


Summary for PRC §92060 - Dam Removal and Related Water Infrastructure

Allocation:

$75,000,000

Statewide Bond Costs:

$563,000

Enacted/Proposed Total:

$35,183,000

Outyear Commitments:

$2,332,000

Balance:

$36,922,000


Chapter 4

Coastal Resilience

PRC §92070

Allocation: Central Valley Chinook Salmon Hatcheries

Net Allocation: $24,812,000


For hatchery upgrades and expansions and for new conservation hatcheries that increase fish production and include the latest technologies to supports pecies conservation and reintroduction efforts necessary to support genetically diverse populations of Central Valley Chinook Salmon.


PRC §92070

Department: California Department of Fish and Wildlife

Purpose Type: Program Delivery

Chapter 4 PRC §92070
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3600-003-6093 (1) 2600 Budget Act $327,000 Hatchery Upgrades and Expansions 06/30/2026 06/30/2028 B1081PD
Proposed 2026 3600-003-6093 (1) 2600 Budget Act $1,308,000 Hatchery Upgrades and Expansions 06/30/2027 06/30/2029 B1081PD

Program Delivery Enacted Total: $327,000

Program Delivery Proposed Total: $1,308,000

PRC §92070

Department: California Department of Fish and Wildlife

Purpose Type: Projects

Chapter 4 PRC §92070
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3600-004-6093 (1) 2600 Budget Act $4,673,000 Hatchery Upgrades and Expansions 06/30/2028 06/30/2030 B1081PJ
Proposed 2026 3600-004-6093 (1) 2600 Budget Act $18,504,000 Hatchery Upgrades and Expansions 06/30/2029 06/30/2031 B1081PJ

Projects Enacted Total: $4,673,000

Projects Proposed Total: $18,504,000


Summary for PRC §92070 - Central Valley Chinook Salmon Hatcheries

Allocation:

$25,000,000

Statewide Bond Costs:

$188,000

Enacted/Proposed Total:

$24,812,000

Outyear Commitments:

$0

Balance:

$0


Summary for Chapter 4: Coastal Resilience

Allocation:

$1,200,000,000

Statewide Bond Costs:

$9,003,000

Enacted/Proposed Total:

$386,637,000

Outyear Commitments:

$32,512,000

Balance:

$771,848,000

Enacted:

$279,150,000

Proposed:

$107,487,000


Chapter 5

Extreme Heat Mitigation

PRC §92510

Allocation: Extreme Heat and Community Resilience Program

Net Allocation: $49,625,000


Projects that reduce the impact of extreme heat, reduce the urban heat island effect, and build community resilience in order to strengthen communities that are vulnerable to the extreme heat impacts of climate change.


PRC §92510

Department: Land Use and Climate Innovation

Purpose Type: Program Delivery

Chapter 5 PRC §92510
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0650-001-6093 (1) 0360 Budget Act $1,050,000 Extreme Heat and Community Resilience Program 06/30/2026 06/30/2028 B1025PD

Program Delivery Enacted Total: $1,050,000

PRC §92510

Department: Land Use and Climate Innovation

Purpose Type: Projects

Chapter 5 PRC §92510
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0650-101-6093 (1) 0360 Budget Act $20,000,000 Extreme Heat and Community Resilience Program 06/30/2030 06/30/2032 B1025PJ
Enacted 2025 0650-101-6093 (1) 0360 Budget Act $2,000,000 Sierra Vista and Placerita Junior High School Green Pathways 06/30/2030 06/30/2032 B1025PJ
Proposed 2026 0650-101-6093 (1) 0360 Budget Act $24,125,000 Extreme Heat and Community Resilience Program 06/30/2031 06/30/2033 B1025PJ

Projects Enacted Total: $22,000,000

Projects Proposed Total: $24,125,000


Summary for PRC §92510 - Extreme Heat and Community Resilience Program

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$47,175,000

Outyear Commitments:

$2,450,000

Balance:

$0


Chapter 5

Extreme Heat Mitigation

PRC §92520

Allocation: Transformative Climate Communities Program

Net Allocation: $148,875,000


Projects that provide local economic, environmental, and health benefits, and improve the resilience of priority populations, as defined by the Transformative Climate Communities Program guidelines.


PRC §92520

Department: Land Use and Climate Innovation

Purpose Type: Projects

Chapter 5 PRC §92520
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0650-101-6093 (2) 0370 Budget Act $1,000,000 Transformative Climate Communities Program 06/30/2030 06/30/2032 B1026PJ
Proposed 2026 0650-101-6093 (2) 0370 Budget Act $137,375,000 Transformative Climate Communities Program 06/30/2031 06/30/2033 B1026PJ

Projects Enacted Total: $1,000,000

Projects Proposed Total: $137,375,000


Summary for PRC §92520 - Transformative Climate Communities Program

Allocation:

$150,000,000

Statewide Bond Costs:

$1,125,000

Enacted/Proposed Total:

$138,375,000

Outyear Commitments:

$7,036,000

Balance:

$3,464,000


Chapter 5

Extreme Heat Mitigation

PRC §92530

Allocation: Urban Greening

Net Allocation: $99,250,000


Competitive grants for urban greening. These funds shall support projects that mitigate the urban heat island effect, rising temperatures, and extreme heat impacts. Eligible projects may include, but are not limited to, the creation and expansion of green streets and alleyways, and investments that support an expanded urban greening program that supports the creation of green recreational parks and green schoolyards in park-poor communities.


PRC §92530

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 5 PRC §92530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $700,000 Urban Greening Program 06/30/2026 06/30/2028 B1004PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $700,000 Urban Greening Program 06/30/2027 06/30/2029 B1004PD

Program Delivery Enacted Total: $700,000

Program Delivery Proposed Total: $700,000

PRC §92530

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 5 PRC §92530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $46,125,000 Competitive Grants for Urban Greening 06/30/2028 06/30/2030 B1004PJ

Projects Enacted Total: $46,125,000


Summary for PRC §92530 - Urban Greening

Allocation:

$100,000,000

Statewide Bond Costs:

$750,000

Enacted/Proposed Total:

$47,525,000

Outyear Commitments:

$2,800,000

Balance:

$48,925,000


Chapter 5

Extreme Heat Mitigation

PRC §92540

Allocation: Urban Forests

Net Allocation: $49,625,000


Protect or augment California’s urban forests pursuant to Section 4799.12. Projects shall contribute to mitigating the urban heat island effect and extreme heat impacts.


PRC §92540

Department: California Department of Forestry and Fire Protection

Purpose Type: Program Delivery

Chapter 5 PRC §92540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3540-006-6093 (1) 2470 Budget Act $500,000 Urban Forestry Program 06/30/2026 06/30/2028 B1072PD
Proposed 2026 3540-006-6093 (1) 2470 Budget Act $500,000 Urban Forestry Program 06/30/2027 06/30/2029 B1072PD

Program Delivery Enacted Total: $500,000

Program Delivery Proposed Total: $500,000

PRC §92540

Department: California Department of Forestry and Fire Protection

Purpose Type: Projects

Chapter 5 PRC §92540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3540-106-6093 (1) 2470 Budget Act $21,750,000 Urban and Community Forestry 06/30/2029 06/30/2032 B1072PJ

Projects Proposed Total: $21,750,000

PRC §92540

Department: California Department of Forestry and Fire Protection

Purpose Type: Technical Assistance

Chapter 5 PRC §92540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3540-006-6093 (1) 2470 Budget Act $500,000 Urban Forestry Program 06/30/2027 06/30/2029 B1072TA

Technical Assistance Proposed Total: $500,000


Summary for PRC §92540 - Urban Forests

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$23,250,000

Outyear Commitments:

$3,400,000

Balance:

$22,975,000


Chapter 5

Extreme Heat Mitigation

PRC §92550

Allocation: Community Resilience Centers

Net Allocation: $59,550,000


Competitive grants for the creation of strategically located community resilience centers across diverse regions of the state at eligible community facilities. These grants shall be awarded to eligible community facilities that model integrated delivery of emergency response services during disruptions, including zero-emission backup power, drinking water, clean air, cooling, food storage, shelter, telecommunications and broadband services, economic assistance, accommodation of pets, and other health protection measures and emergency resources during a disaster, state of emergency, local emergency, or deenergization event. The Office of Emergency Services and the Strategic Growth Council shall coordinate with the Department of Food and Agriculture to ensure there is no duplication with funding awarded under Section 92560.


PRC §92550

Department: Land Use and Climate Innovation

Purpose Type: Program Delivery

Chapter 5 PRC §92550
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0650-001-6093 (2) 0370 Budget Act $284,000 Community Resilience Centers 06/30/2026 06/30/2028 B1027PD
Proposed 2026 0650-001-6093 (1) 0370 Budget Act $284,000 Community Resilience Centers 06/30/2027 06/30/2029 B1027PD

Program Delivery Enacted Total: $284,000

Program Delivery Proposed Total: $284,000

PRC §92550

Department: Land Use and Climate Innovation

Purpose Type: Projects

Chapter 5 PRC §92550
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0650-101-6093 (2) 0370 Budget Act $500,000 Community Resilience Centers Program 06/30/2030 06/30/2032 B1027PJ
Proposed 2026 0650-101-6093 (2) 0370 Budget Act $55,000,000 Community Resilience Centers 06/30/2031 06/30/2033 B1027PJ

Projects Enacted Total: $500,000

Projects Proposed Total: $55,000,000


Summary for PRC §92550 - Community Resilience Centers

Allocation:

$60,000,000

Statewide Bond Costs:

$450,000

Enacted/Proposed Total:

$56,068,000

Outyear Commitments:

$2,243,000

Balance:

$1,239,000


Chapter 5

Extreme Heat Mitigation

PRC §92560

Allocation: Fairground Upgrades

Net Allocation: $39,700,000


Grants to fairgrounds operated by the network of California fairs for modifications or upgrades that do one or both of the following activities: (a) Enhance the ability of those facilities to serve as multirole community, staging, and evacuation centers to provide community resilience benefits during a disaster, state of emergency, local emergency, or deenergization event. (b) Deploy communications and broadband infrastructure at those facilities to improve their capability to serve as multirole community, staging, and evacuation centers and enhance local telecommunications service.


PRC §92560

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 5 PRC §92560
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (3) 6580 Budget Act $700,000 Fairground Upgrades 06/30/2026 06/30/2028 B1230PD
Proposed 2026 8570-001-6093 (2) 6580 Budget Act $700,000 Fairground Emergency Response Capability Upgrades 06/30/2027 06/30/2029 B1230PD

Program Delivery Enacted Total: $700,000

Program Delivery Proposed Total: $700,000

PRC §92560

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 5 PRC §92560
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-101-6093 (2) 6580 Budget Act $36,900,000 Fairground Upgrades 06/30/2028 06/30/2030 B1230PJ

Projects Enacted Total: $36,900,000


Summary for PRC §92560 - Fairground Upgrades

Allocation:

$40,000,000

Statewide Bond Costs:

$300,000

Enacted/Proposed Total:

$38,300,000

Outyear Commitments:

$1,400,000

Balance:

$0


Summary for Chapter 5: Extreme Heat Mitigation

Allocation:

$450,000,000

Statewide Bond Costs:

$3,375,000

Enacted/Proposed Total:

$350,693,000

Outyear Commitments:

$19,329,000

Balance:

$76,603,000

Enacted:

$109,759,000

Proposed:

$240,934,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93010

Allocation: Protect and Enhance Fish and Wildlife

Net Allocation: $662,990,000


Grant programs to protect and enhance fish and wildlife resources and habitat and achieve the state’s biodiversity, public access, and conservation goals. Funding shall not be used to reduce or offset environmental mitigation or compliance obligations otherwise required, but may be used as part of a funding partnership to enhance, expand, or augment conservation efforts required by mitigation. Nothing in this subdivision authorizes the expenditure of bond funds for voluntary agreements as described in Section 80114.


PRC §93010

Department: Wildlife Conservation Board

Purpose Type: Program Delivery

Chapter 6 PRC §93010
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-001-6093 (1) 2710 Budget Act $1,000,000 Protect and Enhance Fish and Wildlife Resources and Habitats 06/30/2026 06/30/2028 B1093PD
Proposed 2026 3640-001-6093 (1) 2710 Budget Act $1,000,000 Protect and Enhance Fish and Wildlife Resources and Habitats 06/30/2027 06/30/2029 B1093PD

Program Delivery Enacted Total: $1,000,000

Program Delivery Proposed Total: $1,000,000

PRC §93010

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 6 PRC §93010
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $333,000 Bid4Birds Program 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $8,000,000 BirdReturns Program 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $1,670,000 California Winter Wild Rice Habitat Incentive Program 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $16,000,000 Conservation Easement at San Julian Ranch 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $21,500,000 Floodplain and Habitat Restoration Projects in Kern, Kings, and Tulare Counties 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $5,000,000 Miles Creek and Bear Creek Infrastructure and Flood Protection Initiative 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $6,300,000 Native Seed Banking 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-101-6093 (1) 2710 Budget Act $176,197,000 Protect and Enhance Fish and Wildlife Resources and Habitats 06/30/2028 06/30/2030 B1093PJ
Enacted 2025 3640-601-6093 2710 Special Legislation $20,000,000 Invasive Mussel Infestations (Including Golden Mussel) 06/30/2028 06/30/2030 B1093PJ
Proposed 2026 3640-101-6093 (1) 2710 Budget Act $80,000,000 Protect and Enhance Fish and Wildlife Resources and Habitats 06/30/2029 06/30/2031 B1093PJ
Proposed 2026 3640-101-6093 (1) 2710 Budget Act $30,000,000 Salton Sea Management Program - Grant to CDFA 06/30/2029 06/30/2031 B1093PJ

Projects Enacted Total: $255,000,000

Projects Proposed Total: $110,000,000


Summary for PRC §93010 - Protect and Enhance Fish and Wildlife

Allocation:

$668,000,000

Statewide Bond Costs:

$5,010,000

Enacted/Proposed Total:

$367,000,000

Outyear Commitments:

$4,500,000

Balance:

$291,490,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(1)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $47,640,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(1)

Department: Baldwin Hills Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(1)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3835-001-6093 (1) 3090 Budget Act $400,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1155PD
Proposed 2026 3835-001-6093 (1) 3090 Budget Act $400,000 Reduce the Risks of Climate Change Impacts 06/30/2027 06/30/2029 B1155PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $400,000

PRC §93020(a)(1)

Department: Baldwin Hills Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(1)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3835-101-6093 (1) 3090 Budget Act $12,460,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1155PJ

Projects Enacted Total: $12,460,000


Summary for PRC §93020(a)(1) - Reduce the Risks of Climate Change Impacts

Allocation:

$48,000,000

Statewide Bond Costs:

$360,000

Enacted/Proposed Total:

$13,260,000

Outyear Commitments:

$1,600,000

Balance:

$32,780,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(2)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $28,782,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(2)

Department: California Tahoe Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(2)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3125-002-6093 (1) 2340 Budget Act $150,000 Reduce the Risks of Climate Change Impacts Upon Communities, Fish and Wildlife, and Natural Resources 06/30/2026 06/30/2028 B1036PD
Proposed 2026 3125-002-6093 (1) 2340 Budget Act $150,000 Reduce the Risks of Climate Change Impacts 06/30/2027 06/30/2029 B1036PD

Program Delivery Enacted Total: $150,000

Program Delivery Proposed Total: $150,000

PRC §93020(a)(2)

Department: California Tahoe Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(2)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3125-102-6093 (1) 2340 Budget Act $5,222,000 Reduce the Risks of Climate Change Impacts Upon Communities, Fish and Wildlife, and Natural Resources 06/30/2028 06/30/2030 B1036PJ
Proposed 2026 3125-301-6093 (2)(a) 0001389 Budget Act $300,000 Conceptual Feasibility Planning: Study 06/30/2027 06/30/2029 B1036PJ
Proposed 2026 3125-301-6093 (4)(a) 0015172 Budget Act $600,000 Greenway Shared Use Trail Phase III: Preliminary Plans 06/30/2027 06/30/2029 B1036PJ
Proposed 2026 3125-301-6093 (1)(a) 0001388 Budget Act $1,500,000 Opportunity Acquisitions: Acquisitions 06/30/2029 06/30/2031 B1036PJ
Proposed 2026 3125-301-6093 (3)(a) 0012976 Budget Act $1,000,000 Van Sickle Bi-State Park Safety and Equitable Access Improvements: Working Drawings 06/30/2027 06/30/2029 B1036PJ

Projects Enacted Total: $5,222,000

Projects Proposed Total: $3,400,000


Summary for PRC §93020(a)(2) - Reduce the Risks of Climate Change Impacts

Allocation:

$29,000,000

Statewide Bond Costs:

$218,000

Enacted/Proposed Total:

$8,922,000

Outyear Commitments:

$18,480,000

Balance:

$1,380,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(3)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $10,917,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(3)

Department: Coachella Valley Mountains Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(3)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3850-001-6093 (1) 3180 Budget Act $100,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1165PD
Proposed 2026 3850-001-6093 (1) 3180 Budget Act $100,000 Reduce the Risks of Climate Change Impacts 06/30/2027 06/30/2029 B1165PD

Program Delivery Enacted Total: $100,000

Program Delivery Proposed Total: $100,000

PRC §93020(a)(3)

Department: Coachella Valley Mountains Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(3)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3850-101-6093 (1) 3180 Budget Act $2,200,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1165PJ
Proposed 2026 3850-101-6093 (1) 3180 Budget Act $2,200,000 Reduce the Risks of Climate Change Impacts 06/30/2029 06/30/2031 B1165PJ

Projects Enacted Total: $2,200,000

Projects Proposed Total: $2,200,000


Summary for PRC §93020(a)(3) - Reduce the Risks of Climate Change Impacts

Allocation:

$11,000,000

Statewide Bond Costs:

$83,000

Enacted/Proposed Total:

$4,600,000

Outyear Commitments:

$450,000

Balance:

$5,867,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(4)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $28,782,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(4)

Department: Sacramento-San Joaquin Delta Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(4)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3875-001-6093 (1) 3350 Budget Act $300,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1210PD
Proposed 2026 3875-001-6093 (1) 3350 Budget Act $150,000 Ecosystem Restoration, Climate Adaption, and Community Enhancement Programs 06/30/2027 06/30/2029 B1210PD

Program Delivery Enacted Total: $300,000

Program Delivery Proposed Total: $150,000

PRC §93020(a)(4)

Department: Sacramento-San Joaquin Delta Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(4)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3875-101-6093 (1) 3350 Budget Act $4,000,000 Reduce the Risks of Climate Change Impacts - Jersey Island, Bethel Island, Small Rice Farmer Incentive 06/30/2028 06/30/2030 B1210PJ
Proposed 2026 3875-101-6093 (1) 3350 Budget Act $15,000,000 Reduce the Risks of Climate Change Impacts 06/30/2029 06/30/2031 B1210PJ

Projects Enacted Total: $4,000,000

Projects Proposed Total: $15,000,000

PRC §93020(a)(4)

Department: Sacramento-San Joaquin Delta Conservancy

Purpose Type: Technical Assistance

Chapter 6 PRC §93020(a)(4)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3875-101-6093 (1) 3350 Budget Act $200,000 Reduce the Risks of Climate Change Impacts 06/30/2029 06/30/2031 B1210TA

Technical Assistance Proposed Total: $200,000


Summary for PRC §93020(a)(4) - Reduce the Risks of Climate Change Impacts

Allocation:

$29,000,000

Statewide Bond Costs:

$218,000

Enacted/Proposed Total:

$19,650,000

Outyear Commitments:

$600,000

Balance:

$8,532,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(5)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $47,640,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(5)

Department: San Diego River Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(5)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3845-002-6093 (1) 3140 Budget Act $100,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1161PD
Proposed 2026 3845-002-6093 (1) 3140 Budget Act $200,000 Conservation, Nature Based Solutions, and Public Access 06/30/2027 06/30/2029 B1161PD

Program Delivery Enacted Total: $100,000

Program Delivery Proposed Total: $200,000

PRC §93020(a)(5)

Department: San Diego River Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(5)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3845-102-6093 (1) 3140 Budget Act $8,000,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1161PJ

Projects Enacted Total: $8,000,000


Summary for PRC §93020(a)(5) - Reduce the Risks of Climate Change Impacts

Allocation:

$48,000,000

Statewide Bond Costs:

$360,000

Enacted/Proposed Total:

$8,300,000

Outyear Commitments:

$800,000

Balance:

$38,540,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(6)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $47,640,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(6)

Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(6)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3825-003-6093 (1) 2990 Budget Act $300,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1147PD
Proposed 2026 3825-003-6093 (1) 2990 Budget Act $450,000 Reduce the Risks of Climate Change Impacts 06/30/2027 06/30/2029 B1147PD

Program Delivery Enacted Total: $300,000

Program Delivery Proposed Total: $450,000

PRC §93020(a)(6)

Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(6)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3825-103-6093 (1) 2990 Budget Act $10,000,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1147PJ
Proposed 2026 3825-103-6093 (1) 2990 Budget Act $11,000,000 Reduce the Risks of Climate Change Impacts 06/30/2029 06/30/2031 B1147PJ

Projects Enacted Total: $10,000,000

Projects Proposed Total: $11,000,000


Summary for PRC §93020(a)(6) - Reduce the Risks of Climate Change Impacts

Allocation:

$48,000,000

Statewide Bond Costs:

$360,000

Enacted/Proposed Total:

$21,750,000

Outyear Commitments:

$2,000,000

Balance:

$23,890,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(7)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $10,918,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(7)

Department: San Joaquin River Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(7)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3830-001-6093 (1) 3050 Budget Act $192,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1150PD
Proposed 2026 3830-001-6093 (1) 3050 Budget Act $192,000 Reduce the Risks of Climate Change Impacts 06/30/2027 06/30/2029 B1150PD

Program Delivery Enacted Total: $192,000

Program Delivery Proposed Total: $192,000

PRC §93020(a)(7)

Department: San Joaquin River Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(7)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3830-101-6093 (1) 3050 Budget Act $5,115,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1150PJ
Proposed 2026 3830-101-6093 (1) 3050 Budget Act $5,035,000 Reduce the Risks of Climate Change Impacts 06/30/2029 06/30/2031 B1150PJ

Projects Enacted Total: $5,115,000

Projects Proposed Total: $5,035,000


Summary for PRC §93020(a)(7) - Reduce the Risks of Climate Change Impacts

Allocation:

$11,000,000

Statewide Bond Costs:

$82,000

Enacted/Proposed Total:

$10,534,000

Outyear Commitments:

$384,000

Balance:

$0


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(8)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $47,640,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(8)

Department: Santa Monica Mountains Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(8)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-003-6093 (1) 2940 Budget Act $400,000 Reduce the Risks of Climate Change Impacts 06/30/2026 06/30/2028 B1137PD
Proposed 2026 3810-003-6093 (1) 2940 Budget Act $400,000 Reduce the Risks of Climate Change Impacts 06/30/2027 06/30/2029 B1137PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $400,000

PRC §93020(a)(8)

Department: Santa Monica Mountains Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(8)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-103-6093 (1) 2945 Budget Act $23,685,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1137PJ
Proposed 2026 3810-103-6093 (1) 2945 Budget Act $7,000,000 Reduce the Risks of Climate Change Impacts 06/30/2029 06/30/2031 B1137PJ

Projects Enacted Total: $23,685,000

Projects Proposed Total: $7,000,000

PRC §93020(a)(8)

Department: Santa Monica Mountains Conservancy

Purpose Type: Community Access

Chapter 6 PRC §93020(a)(8)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-103-6093 (1) 2945 Budget Act $1,315,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1137CA

Community Access Enacted Total: $1,315,000


Summary for PRC §93020(a)(8) - Reduce the Risks of Climate Change Impacts

Allocation:

$48,000,000

Statewide Bond Costs:

$360,000

Enacted/Proposed Total:

$32,800,000

Outyear Commitments:

$800,000

Balance:

$14,040,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93020(a)(9)

Allocation: Reduce the Risks of Climate Change Impacts

Net Allocation: $47,640,000


Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.


PRC §93020(a)(9)

Department: Sierra Nevada Conservancy

Purpose Type: Program Delivery

Chapter 6 PRC §93020(a)(9)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3855-003-6093 (1) 3220 Budget Act $59,000 Nature-Based Solutions 06/30/2027 06/30/2029 B1172PD

Program Delivery Proposed Total: $59,000

PRC §93020(a)(9)

Department: Sierra Nevada Conservancy

Purpose Type: Projects

Chapter 6 PRC §93020(a)(9)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3855-103-6093 (1) 3220 Budget Act $9,925,000 Reduce the Risks of Climate Change Impacts 06/30/2028 06/30/2030 B1172PJ

Projects Enacted Total: $9,925,000


Summary for PRC §93020(a)(9) - Reduce the Risks of Climate Change Impacts

Allocation:

$48,000,000

Statewide Bond Costs:

$360,000

Enacted/Proposed Total:

$9,984,000

Outyear Commitments:

$944,000

Balance:

$36,712,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93010; 93030 ref 1

Allocation: Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors

Net Allocation: $99,250,000


Projects to improve habitat connectivity and establish wildlife crossings and corridors.


PRC §93010; 93030 ref 1

Department: Wildlife Conservation Board

Purpose Type: Program Delivery

Chapter 6 PRC §93010; 93030 ref 1
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-001-6093 (1) 2710 Budget Act $500,000 Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors 06/30/2026 06/30/2028 B1094PD
Proposed 2026 3640-001-6093 (1) 2710 Budget Act $500,000 Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors 06/30/2027 06/30/2029 B1094PD

Program Delivery Enacted Total: $500,000

Program Delivery Proposed Total: $500,000

PRC §93010; 93030 ref 1

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 6 PRC §93010; 93030 ref 1
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-102-6093 (1) 2710 Budget Act $20,000,000 Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors 06/30/2028 06/30/2030 B1094PJ
Proposed 2026 3640-102-6093 (1) 2710 Budget Act $20,000,000 Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors 06/30/2029 06/30/2031 B1094PJ

Projects Enacted Total: $20,000,000

Projects Proposed Total: $20,000,000


Summary for PRC §93010; 93030 ref 1 - Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors

Allocation:

$100,000,000

Statewide Bond Costs:

$750,000

Enacted/Proposed Total:

$41,000,000

Outyear Commitments:

$2,000,000

Balance:

$56,250,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93010; 93030 ref 2

Allocation: San Andreas Corridor Program

Net Allocation: $79,400,000


Establish the San Andreas Corridor Program for the protection and restoration of wildlife corridors along the inner Coast Ranges and the San Andreas Fault.


PRC §93010; 93030 ref 2

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 6 PRC §93010; 93030 ref 2
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3640-108-6093 (1) 2710 Budget Act $20,000,000 San Andreas Corridor Program 06/30/2029 06/30/2031 B1095PJ

Projects Proposed Total: $20,000,000


Summary for PRC §93010; 93030 ref 2 - San Andreas Corridor Program

Allocation:

$80,000,000

Statewide Bond Costs:

$600,000

Enacted/Proposed Total:

$20,000,000

Outyear Commitments:

$0

Balance:

$59,400,000


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93040

Allocation: Tribal Nature-Based Solutions Program

Net Allocation: $9,925,000


Tribal Nature-Based Solutions Program


PRC §93040

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 6 PRC §93040
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $175,000 Tribal Nature Based Solutions Program 06/30/2026 06/30/2028 B1005PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $175,000 Tribal Nature Based Solutions Program 06/30/2027 06/30/2029 B1005PD

Program Delivery Enacted Total: $175,000

Program Delivery Proposed Total: $175,000

PRC §93040

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 6 PRC §93040
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $9,225,000 Tribal Nature Based Solutions Program 06/30/2028 06/30/2030 B1005PJ

Projects Enacted Total: $9,225,000


Summary for PRC §93040 - Tribal Nature-Based Solutions Program

Allocation:

$10,000,000

Statewide Bond Costs:

$75,000

Enacted/Proposed Total:

$9,575,000

Outyear Commitments:

$350,000

Balance:

$0


Chapter 6

Protect Biodiversity and Accelerating Nature-Based Climate Solutions

PRC §93010; 93050

Allocation: Southern Ballona Creek Watershed

Net Allocation: $21,835,000


Projects for climate change adaptation improvements to protect, conserve, and restore the health and resilience of the southern Ballona Creek Watershed.


PRC §93010; 93050

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 6 PRC §93010; 93050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-106-6093 (1) 2710 Budget Act $20,000,000 Southern Ballona Creek Watershed 06/30/2028 06/30/2030 B1096PJ
Proposed 2026 3640-106-6093 (1) 2710 Budget Act $1,835,000 Southern Ballona Creek Watershed 06/30/2028 06/30/2030 B1096PJ

Projects Enacted Total: $20,000,000

Projects Proposed Total: $1,835,000


Summary for PRC §93010; 93050 - Southern Ballona Creek Watershed

Allocation:

$22,000,000

Statewide Bond Costs:

$165,000

Enacted/Proposed Total:

$21,835,000

Outyear Commitments:

$0

Balance:

$0


Summary for Chapter 6: Protect Biodiversity and Accelerating Nature-Based Climate Solutions

Allocation:

$1,200,000,000

Statewide Bond Costs:

$9,001,000

Enacted/Proposed Total:

$589,210,000

Outyear Commitments:

$32,908,000

Balance:

$568,881,000

Enacted:

$389,764,000

Proposed:

$199,446,000


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93510(a)

Allocation: Soil Health, Atmospheric Carbon Removal, or Soil Carbon Sequestration

Net Allocation: $64,513,000


Grants to promote practices on farms and ranches that improve soil health, or accelerate atmospheric carbon removal or soil carbon sequestration. Funds shall be allocated to projects that provide meaningful and direct benefits to socially disadvantaged farmers and ranchers.


PRC §93510(a)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93510(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (4) 6590 Budget Act $910,000 Healthy Soils 06/30/2026 06/30/2028 B1231PD
Proposed 2026 8570-001-6093 (3) 6590 Budget Act $910,000 Healthy Soils 06/30/2027 06/30/2029 B1231PD

Program Delivery Enacted Total: $910,000

Program Delivery Proposed Total: $910,000

PRC §93510(a)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93510(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-101-6093 (3) 6590 Budget Act $35,000,000 Healthy Soils Program 06/30/2028 06/30/2030 B1231PJ
Proposed 2026 8570-101-6093 (2) 6590 Budget Act $24,963,000 Healthy Soils 06/30/2029 06/30/2031 B1231PJ

Projects Enacted Total: $35,000,000

Projects Proposed Total: $24,963,000


Summary for PRC §93510(a) - Soil Health, Atmospheric Carbon Removal, or Soil Carbon Sequestration

Allocation:

$65,000,000

Statewide Bond Costs:

$487,000

Enacted/Proposed Total:

$61,783,000

Outyear Commitments:

$2,730,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93510(b)

Allocation: State Water Efficiency and Enhancement Program

Net Allocation: $39,700,000


State Water Efficiency and Enhancement Program to promote onfarm water use efficiency with a focus on multiple-benefit projects that improve resilience to climate change and save water on California agricultural operations. Funds shall be allocated to projects that provide meaningful and direct benefits to socially disadvantaged farmers and ranchers.


PRC §93510(b)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93510(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (4) 6590 Budget Act $700,000 State Water Efficiency and Enhancement Program (SWEEP) 06/30/2026 06/30/2028 B1232PD
Proposed 2026 8570-001-6093 (3) 6590 Budget Act $700,000 State Water Efficiency and Enhancement Program (SWEEP) 06/30/2027 06/30/2029 B1232PD

Program Delivery Enacted Total: $700,000

Program Delivery Proposed Total: $700,000

PRC §93510(b)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93510(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-101-6093 (3) 6590 Budget Act $36,900,000 State Water Efficiency and Enhancement Program (SWEEP) 06/30/2028 06/30/2030 B1232PJ

Projects Enacted Total: $36,900,000


Summary for PRC §93510(b) - State Water Efficiency and Enhancement Program

Allocation:

$40,000,000

Statewide Bond Costs:

$300,000

Enacted/Proposed Total:

$38,300,000

Outyear Commitments:

$1,400,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93520

Allocation: Invasive Species Projects

Net Allocation: $19,850,000


Invasive species projects and activities recommended by the Invasive Species Council of California. Preference shall be given to projects that restore and protect biodiversity and ecosystem health. Consideration shall be given to geographic equity.


PRC §93520

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93520
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (1) 6570 Budget Act $19,850,000 Invasive Species Account 06/30/2026 06/30/2028 B1233PJ

Projects Enacted Total: $19,850,000


Summary for PRC §93520 - Invasive Species Projects

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$19,850,000

Outyear Commitments:

$0

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93530

Allocation: Protection, Restoration, Conservation and Enhancement of Farm and Range Lands

Net Allocation: $14,888,000


Projects for the protection, restoration, conservation, and enhancement of farmland and rangeland, including, but not limited to, the acquisition of fee title or easements, that improve climate resilience, open-space soil health, atmospheric carbon removal, soil carbon sequestration, erosion control, watershed health, water quality, or water retention. Projects shall provide multiple benefits. In awarding funds for farmland and rangeland projects pursuant to this section, the Department of Conservation shall give preference to projects for small- and medium-sized farms.


PRC §93530

Department: Department of Conservation

Purpose Type: Program Delivery

Chapter 7 PRC §93530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-004-6093 (1) 2430 Budget Act $150,000 Protection, Restoration, Conservation, and Enhancement of Farm and Range Lands 06/30/2026 06/30/2028 B1058PD
Proposed 2026 3480-004-6093 (1) 2430 Budget Act $150,000 Working Lands Conservation, Restoration, and Enhancement 06/30/2027 06/30/2029 B1058PD

Program Delivery Enacted Total: $150,000

Program Delivery Proposed Total: $150,000

PRC §93530

Department: Department of Conservation

Purpose Type: Projects

Chapter 7 PRC §93530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3480-104-6093 (1) 2430 Budget Act $5,000,000 Grants for the Planning, Design, and Implementation of Projects 06/30/2028 06/30/2030 B1058PJ
Enacted 2025 3480-104-6093 (1) 2430 Budget Act $1,850,000 Protection, Restoration, Conservation, and Enhancement of Farm and Range Lands 06/30/2028 06/30/2030 B1058PJ

Projects Enacted Total: $6,850,000


Summary for PRC §93530 - Protection, Restoration, Conservation and Enhancement of Farm and Range Lands

Allocation:

$15,000,000

Statewide Bond Costs:

$112,000

Enacted/Proposed Total:

$7,150,000

Outyear Commitments:

$550,000

Balance:

$7,188,000


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93540(a)

Allocation: Certified Mobile Farmers' Markets

Net Allocation: $19,850,000


infrastructure related to certified mobile farmers' markets, including, but not limited to, a mobile farmers market vehicle, refrigeration, and other equipment to comply with relevant sections of the Health and Safety Code and related regulations.


PRC §93540(a)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93540(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (2) 6575 Budget Act $350,000 Certified Mobile Farmers' Markets 06/30/2026 06/30/2028 B1234PD
Proposed 2026 8570-001-6093 (1) 6575 Budget Act $350,000 Certified Mobile Farmers' Markets 06/30/2027 06/30/2029 B1234PD

Program Delivery Enacted Total: $350,000

Program Delivery Proposed Total: $350,000

PRC §93540(a)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93540(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-101-6093 (1) 6575 Budget Act $9,250,000 Certified Mobile Farmers' Markets 06/30/2028 06/30/2030 B1234PJ
Proposed 2026 8570-101-6093 (1) 6575 Budget Act $9,200,000 Certified Mobile Farmers' Markets 06/30/2029 06/30/2031 B1234PJ

Projects Enacted Total: $9,250,000

Projects Proposed Total: $9,200,000


Summary for PRC §93540(a) - Certified Mobile Farmers' Markets

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$19,150,000

Outyear Commitments:

$700,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93540(b)

Allocation: Year-Round Certified Farmers' Markets

Net Allocation: $19,850,000


Develop year-round infrastructure for certified farmers’ markets, as defined in Section 47004 of the Food and Agricultural Code, fishermen’s markets, as defined in Section 113780 of the Health and Safety Code, or tribe-operated or native-serving farmers’ markets.


PRC §93540(b)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93540(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (2) 6575 Budget Act $350,000 Year-round Certified Farmers' Markets 06/30/2026 06/30/2028 B1235PD
Proposed 2026 8570-001-6093 (1) 6575 Budget Act $350,000 Year-round Certified Farmers' Markets 06/30/2027 06/30/2029 B1235PD

Program Delivery Enacted Total: $350,000

Program Delivery Proposed Total: $350,000

PRC §93540(b)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93540(b)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-101-6093 (1) 6575 Budget Act $9,250,000 Year-round Certified Farmers' Markets 06/30/2028 06/30/2030 B1235PJ
Proposed 2026 8570-101-6093 (1) 6575 Budget Act $9,200,000 Year-round Certified Farmers' Markets 06/30/2029 06/30/2031 B1235PJ

Projects Enacted Total: $9,250,000

Projects Proposed Total: $9,200,000


Summary for PRC §93540(b) - Year-Round Certified Farmers' Markets

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$19,150,000

Outyear Commitments:

$700,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93540(c)

Allocation: Urban Agriculture Projects

Net Allocation: $19,850,000


Urban agriculture projects that create or expand city or suburban community farms or gardens, including community food producers, as defined in Section 113752 of the Health and Safety Code, through in-ground small plot cultivation, raised beds, mushroom growing, rooftop farms, and cultivation of vacant lots and in parks.


PRC §93540(c)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93540(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (2) 6575 Budget Act $350,000 Urban Agriculture Projects 06/30/2026 06/30/2028 B1236PD
Proposed 2026 8570-001-6093 (1) 6575 Budget Act $350,000 Urban Agriculture Projects 06/30/2027 06/30/2029 B1236PD

Program Delivery Enacted Total: $350,000

Program Delivery Proposed Total: $350,000

PRC §93540(c)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93540(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-101-6093 (1) 6575 Budget Act $18,450,000 Urban Agriculture Projects 06/30/2028 06/30/2030 B1236PJ

Projects Enacted Total: $18,450,000


Summary for PRC §93540(c) - Urban Agriculture Projects

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$19,150,000

Outyear Commitments:

$700,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93540(d)

Allocation: Regional Farm Equipment Sharing

Net Allocation: $14,888,000


Grants for regional farm equipment sharing. Preference shall be given to projects and programs that benefit small- and medium-sized farms and socially disadvantaged farmers and ranchers.


PRC §93540(d)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93540(d)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (4) 6590 Budget Act $210,000 Regional Farm Equipment Sharing 06/30/2026 06/30/2028 B1237PD
Proposed 2026 8570-001-6093 (3) 6590 Budget Act $210,000 Regional Farm Equipment Sharing 06/30/2027 06/30/2029 B1237PD

Program Delivery Enacted Total: $210,000

Program Delivery Proposed Total: $210,000

PRC §93540(d)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93540(d)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 8570-101-6093 (2) 6590 Budget Act $13,838,000 Regional Farm Equipment Sharing 06/30/2029 06/30/2031 B1237PJ

Projects Proposed Total: $13,838,000


Summary for PRC §93540(d) - Regional Farm Equipment Sharing

Allocation:

$15,000,000

Statewide Bond Costs:

$112,000

Enacted/Proposed Total:

$14,258,000

Outyear Commitments:

$630,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93540(e)

Allocation: Tribal Food Sovereignty

Net Allocation: $14,888,000


To advance tribes’ food sovereignty to grow, produce, procure, and distribute foods that reflect Native American culture and traditions and support the development of tribal producers and vendors, including, but not limited to, the following projects: (1) Irrigation and water infrastructure. (2) Utility and power infrastructure. (3) Food processing infrastructure.


PRC §93540(e)

Department: California Department of Food and Agriculture

Purpose Type: Program Delivery

Chapter 7 PRC §93540(e)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 8570-001-6093 (4) 6590 Budget Act $210,000 Tribal Food Sovereignty 06/30/2026 06/30/2028 B1238PD
Proposed 2026 8570-001-6093 (3) 6590 Budget Act $210,000 Tribal Food Sovereignty 06/30/2027 06/30/2029 B1238PD

Program Delivery Enacted Total: $210,000

Program Delivery Proposed Total: $210,000

PRC §93540(e)

Department: California Department of Food and Agriculture

Purpose Type: Projects

Chapter 7 PRC §93540(e)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 8570-101-6093 (2) 6590 Budget Act $13,838,000 Tribal Food Sovereignty 06/30/2029 06/30/2031 B1238PJ

Projects Proposed Total: $13,838,000


Summary for PRC §93540(e) - Tribal Food Sovereignty

Allocation:

$15,000,000

Statewide Bond Costs:

$112,000

Enacted/Proposed Total:

$14,258,000

Outyear Commitments:

$630,000

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93550

Allocation: Land Access and Tenure for Socially Disadvantaged Farmers or Ranchers, Tribal Producers, and Beginning Farmers and Ranchers

Net Allocation: $29,775,000


In consultation with the California Agricultural Land Equity Task Force at the Strategic Growth Council, to improve land access and tenure for socially disadvantaged farmers or ranchers, tribal producers, and beginning farmers and ranchers. May make low-interest loans to qualified entities, which shall include land trusts, nonprofit organizations, public agencies, farmer cooperatives, tribal governments, or tribal entities, for the purpose of acquiring agricultural lands to transfer or provide long-term leases to socially disadvantaged farmers or ranchers and beginning farmers and ranchers. Any agricultural land acquired pursuant to this section shall be required to have an agricultural land conservation easement before being leased or transferred, and the department may require additional appropriate resale restrictions, such as affordability provisions, preemptive purchase right, or shared appreciation consistent with the purposes of this subdivision. The Department of Conservation shall ensure that the proceeds of future resales of land continue to be used for purposes of this chapter.


PRC §93550

Department: Department of Conservation

Purpose Type: Program Delivery

Chapter 7 PRC §93550
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3480-005-6093 (1) 2430 Budget Act $375,000 Agricultural Land Access and Tenure Loan Program 06/30/2027 06/30/2029 B1059PD

Program Delivery Proposed Total: $375,000

PRC §93550

Department: Department of Conservation

Purpose Type: Projects

Chapter 7 PRC §93550
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3480-105-6093 (1) 2430 Budget Act $4,600,000 Land Access and Tenure for Socially Disadvantaged Farmers/Ranchers, Tribal Producers, and Beginning Farmers/Ranchers 06/30/2029 06/30/2031 B1059PJ

Projects Proposed Total: $4,600,000


Summary for PRC §93550 - Land Access and Tenure for Socially Disadvantaged Farmers or Ranchers, Tribal Producers, and Beginning Farmers and Ranchers

Allocation:

$30,000,000

Statewide Bond Costs:

$225,000

Enacted/Proposed Total:

$4,975,000

Outyear Commitments:

$900,000

Balance:

$23,900,000


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93560

Allocation: Vanpool Vehicles, Clean Technologies, and Infrastructure

Net Allocation: $14,888,000


Grants for the deployment of vanpool vehicles, clean technologies, and related facilities, including, but not limited to, charging and alternative fuel infrastructure, for use by low-income agricultural workers.


PRC §93560

Department: Unspecified

Purpose Type: N/A

Chapter 7 PRC §93560
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
$0

N/A Enacted Total: $0


Summary for PRC §93560 - Vanpool Vehicles, Clean Technologies, and Infrastructure

Allocation:

$15,000,000

Statewide Bond Costs:

$112,000

Enacted/Proposed Total:

$0

Outyear Commitments:

$0

Balance:

$14,888,000


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93570

Allocation: Postsecondary Educational Institutions to Develop Research Farms to Improve Climate Resiliency

Net Allocation: $14,888,000


In consultation with the Department of Food and Agriculture to develop research farms to improve climate resiliency. Funding provided pursuant to this section shall not exceed one million dollars ($1,000,000) per institution and shall be constructed and maintained with environmentally sustainable infrastructure practices.


PRC §93570

Department: Department of Education

Purpose Type: Program Delivery

Chapter 7 PRC §93570
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 6100-001-6093 (1) 5205010 Budget Act $1,050,000 Grants to Postsecondary Education Institutions to Develop Research Farms to Improve Climate Resiliency 06/30/2026 06/30/2028 B1245PD

Program Delivery Enacted Total: $1,050,000

PRC §93570

Department: Department of Education

Purpose Type: Projects

Chapter 7 PRC §93570
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 6100-101-6093 (1) 5205223 Budget Act $13,838,000 Grants to Postsecondary Education Institutions to Develop Research Farms to Improve Climate Resiliency 06/30/2028 06/30/2031 B1245PJ

Projects Enacted Total: $13,838,000


Summary for PRC §93570 - Postsecondary Educational Institutions to Develop Research Farms to Improve Climate Resiliency

Allocation:

$15,000,000

Statewide Bond Costs:

$112,000

Enacted/Proposed Total:

$14,888,000

Outyear Commitments:

$0

Balance:

$0


Chapter 7

Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

PRC §93580

Allocation: Farmworkers Housing Component of the Low-Income Weatherization Program

Net Allocation: $9,925,000


As part of the Farmworker Housing Component of the Low-Income Weatherization Program through the Department of Community Services and Development, to low-income farmworker households for no-cost energy efficiency upgrades designed to reduce greenhouse gas emissions by saving energy. These energy efficiency upgrades shall include, but are not limited to, insulation, central heating and cooling system upgrades, lighting upgrades, and window replacement.


PRC §93580

Department: Department of Community Services and Development

Purpose Type: Program Delivery

Chapter 7 PRC §93580
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 4700-001-6093 (1) 4181 Budget Act $230,000 Low-Income Weatherization Program – Farmworkers Housing Component 06/30/2026 06/30/2028 B1225PD
Proposed 2026 4700-001-6093 (1) 4181 Budget Act $230,000 Low-Income Weatherization Program – Farmworkers Housing Component 06/30/2027 06/30/2029 B1225PD

Program Delivery Enacted Total: $230,000

Program Delivery Proposed Total: $230,000

PRC §93580

Department: Department of Community Services and Development

Purpose Type: Projects

Chapter 7 PRC §93580
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 4700-101-6093 (1) 4181 Budget Act $9,229,000 Low-Income Weatherization Program – Farmworkers Housing Component 06/30/2029 06/30/2031 B1225PJ

Projects Proposed Total: $9,229,000


Summary for PRC §93580 - Farmworkers Housing Component of the Low-Income Weatherization Program

Allocation:

$10,000,000

Statewide Bond Costs:

$75,000

Enacted/Proposed Total:

$9,689,000

Outyear Commitments:

$236,000

Balance:

$0


Summary for Chapter 7: Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands

Allocation:

$300,000,000

Statewide Bond Costs:

$2,247,000

Enacted/Proposed Total:

$242,601,000

Outyear Commitments:

$9,176,000

Balance:

$45,976,000

Enacted:

$153,898,000

Proposed:

$88,703,000


Chapter 8

Park Creation and Outdoor Access

PRC §94010(a)

Allocation: Creation, Expansion, and Renovation of Safe Neighborhood Parks

Net Allocation: $178,650,000


Competitive grant program in accordance with the Statewide Park Development and Community Revitalization Act of 2008 described in Chapter 3.3 (commencing with Section 5640) of Division 5.for the creation, expansion, and renovation of safe neighborhood parks in park-poor neighborhoods.


PRC §94010(a)

Department: California State Parks

Purpose Type: Program Delivery

Chapter 8 PRC §94010(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-001-6093 (1) 2840 Budget Act $1,350,000 Statewide Park Program 06/30/2026 06/30/2028 B1122PD
Proposed 2026 3790-001-6093 (1) 2840 Budget Act $1,710,000 Statewide Park Program 06/30/2027 06/30/2029 B1122PD

Program Delivery Enacted Total: $1,350,000

Program Delivery Proposed Total: $1,710,000

PRC §94010(a)

Department: California State Parks

Purpose Type: Projects

Chapter 8 PRC §94010(a)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-101-6093 (1) 2855036 Budget Act $169,650,000 Safe Neighborhood Parks 06/30/2028 06/30/2031 B1122PJ

Projects Enacted Total: $169,650,000


Summary for PRC §94010(a) - Creation, Expansion, and Renovation of Safe Neighborhood Parks

Allocation:

$180,000,000

Statewide Bond Costs:

$1,350,000

Enacted/Proposed Total:

$172,710,000

Outyear Commitments:

$5,940,000

Balance:

$0


Chapter 8

Park Creation and Outdoor Access

PRC §94010(c)

Allocation: Rehabilitation, Repurposing, or Substantial Improvement of Existing Park Infrastructure

Net Allocation: $19,850,000


For the rehabilitation, repurposing, or substantial improvement of existing park infrastructure that will lead to increased use and enhanced user experiences or increase access, including, but not limited to, for individuals with disabilities, as defined by the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12101 et seq.).


PRC §94010(c)

Department: California State Parks

Purpose Type: Program Delivery

Chapter 8 PRC §94010(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-001-6093 (1) 2840 Budget Act $150,000 Statewide Park Program - Existing Park Infrastructure 06/30/2026 06/30/2028 B1123PD
Proposed 2026 3790-001-6093 (1) 2840 Budget Act $190,000 Statewide Park Program – Existing Park Infrastructure 06/30/2027 06/30/2029 B1123PD

Program Delivery Enacted Total: $150,000

Program Delivery Proposed Total: $190,000

PRC §94010(c)

Department: California State Parks

Purpose Type: Projects

Chapter 8 PRC §94010(c)
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-101-6093 (1) 2855036 Budget Act $18,850,000 Safe Neighborhood Parks - Existing Park Infrastructure 06/30/2028 06/30/2031 B1123PJ

Projects Enacted Total: $18,850,000


Summary for PRC §94010(c) - Rehabilitation, Repurposing, or Substantial Improvement of Existing Park Infrastructure

Allocation:

$20,000,000

Statewide Bond Costs:

$150,000

Enacted/Proposed Total:

$19,190,000

Outyear Commitments:

$660,000

Balance:

$0


Chapter 8

Park Creation and Outdoor Access

PRC §94020

Allocation: Reduction of Climate Impacts and Creation, Protection and Expansion of Outdoor Recreation

Net Allocation: $198,500,000


Reduction of climate impacts on disadvantaged communities and vulnerable populations and the creation, protection, and expansion of outdoor recreation opportunities.


PRC §94020

Department: California Department of Fish and Wildlife

Purpose Type: Program Delivery

Chapter 8 PRC §94020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 3600-006-6093 (1) 2590 Budget Act $1,750,000 Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities 06/30/2027 06/30/2029 B1082PD

Program Delivery Proposed Total: $1,750,000

PRC §94020

Department: California State Parks

Purpose Type: Program Delivery

Chapter 8 PRC §94020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-001-6093 (1) 2840 Budget Act $1,000,000 Outdoor Recreation 06/30/2026 06/30/2028 B1127PD
Proposed 2026 3790-001-6093 (1) 2840 Budget Act $1,000,000 Outdoor Recreation 06/30/2027 06/30/2029 B1127PD

Program Delivery Enacted Total: $1,000,000

Program Delivery Proposed Total: $1,000,000

PRC §94020

Department: Santa Monica Mountains Conservancy

Purpose Type: Program Delivery

Chapter 8 PRC §94020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-005-6093 (1) 2940 Budget Act $47,000 Reduction of Climate Impacts on Disadvantaged Communities & Expansion of Outdoor Recreation 06/30/2026 06/30/2028 B1139PD

Program Delivery Enacted Total: $47,000

PRC §94020

Department: California Department of Fish and Wildlife

Purpose Type: Projects

Chapter 8 PRC §94020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3600-005-6093 (1) 2600 Budget Act $10,000,000 Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities 06/30/2028 06/30/2030 B1082PJ
Proposed 2026 3600-005-6093 (1) 2600 Budget Act $18,250,000 Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities 06/30/2029 06/30/2031 B1082PJ

Projects Enacted Total: $10,000,000

Projects Proposed Total: $18,250,000

PRC §94020

Department: California State Parks

Purpose Type: Projects

Chapter 8 PRC §94020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $10,000,000 Former Airport Lands 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $5,500,000 Outdoor Recreation - Charles White Park 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $5,000,000 Outdoor Recreation - City of San Marcos Park Improvements 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $2,000,000 Outdoor Recreation - Don Fernando Pacheco Adobe Rehabilitation 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $16,200,000 Outdoor Recreation - Eaton Canyon Natural Area and Nature Center 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $500,000 Outdoor Recreation - Flat Top Park 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $4,300,000 Outdoor Recreation - Grove Neighborhood Park Project 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $5,000,000 Outdoor Recreation - Hollister Ranch - Pilot Program Environmental Impact Statement 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $15,000,000 Outdoor Recreation - Hollister Ranch Public Access Plan 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $5,000,000 Outdoor Recreation - Hughes Fire Recovery at Castaic Lake 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $5,000,000 Outdoor Recreation - Rosemead Park improvements 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $22,000,000 Outdoor Recreation - Sepulveda Basin Park Cleanup 06/30/2028 06/30/2030 B1127PJ
Enacted 2025 3790-102-6093 (1) 2855036 Budget Act $10,000,000 Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities 06/30/2028 06/30/2030 B1127PJ
Proposed 2026 3790-004-6093 (1) 2840 Budget Act $4,866,000 Open Space Lands Surrounding the Former Sonoma Development Center 06/30/2032 06/30/2034 B1127PJ

Projects Enacted Total: $105,500,000

Projects Proposed Total: $4,866,000

PRC §94020

Department: Santa Monica Mountains Conservancy

Purpose Type: Projects

Chapter 8 PRC §94020
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3810-105-6093 (1) 2945 Budget Act $2,000,000 Randall Preserve - Reduction of Climate Impacts, Expansion of Outood Recreation 06/30/2028 06/30/2030 B1139PJ

Projects Enacted Total: $2,000,000


Summary for PRC §94020 - Reduction of Climate Impacts and Creation, Protection and Expansion of Outdoor Recreation

Allocation:

$200,000,000

Statewide Bond Costs:

$1,500,000

Enacted/Proposed Total:

$144,413,000

Outyear Commitments:

$5,520,000

Balance:

$48,567,000


Chapter 8

Park Creation and Outdoor Access

PRC §94030

Allocation: Enhancement of the Natural Resource Value and Expanded Trail Access (non-motorized)

Net Allocation: $99,250,000


Protection, restoration, and enhancement of the natural resource values of the state park system and for projects to expand recreational opportunities and public access to state and public park nonmotorized trails. Projects may include enhancing and expanding existing trails and creating new trails.


PRC §94030

Department: State Coastal Conservancy

Purpose Type: Program Delivery

Chapter 8 PRC §94030
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-001-6093 (1) 2805032 Budget Act $700,000 Enhancement of the Natural Resource Value and Expanded Trail Access 06/30/2026 06/30/2028 B1113PD
Proposed 2026 3760-001-6093 (1) 2790 Budget Act $700,000 Great Redwood Trail 06/30/2027 06/30/2029 B1113PD

Program Delivery Enacted Total: $700,000

Program Delivery Proposed Total: $700,000

PRC §94030

Department: Wildlife Conservation Board

Purpose Type: Projects

Chapter 8 PRC §94030
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3640-107-6093 (1) 2710 Budget Act $5,000,000 Enhancement of the Natural Resource Value and Expanded Trail Access - 40 Acre Conservation League 06/30/2028 06/30/2030 B1097PJ

Projects Enacted Total: $5,000,000

PRC §94030

Department: State Coastal Conservancy

Purpose Type: Projects

Chapter 8 PRC §94030
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3760-102-6093 (1) 2805032 Budget Act $3,000,000 Environmental Restoration in the Eel River Canyon 06/30/2028 06/30/2030 B1113PJ
Enacted 2025 3760-102-6093 (1) 2805032 Budget Act $41,350,000 Great Redwood Trail Project 06/30/2028 06/30/2030 B1113PJ
Enacted 2025 3760-102-6093 (1) 2805032 Budget Act $650,000 Master Plan for Great Redwood Trail Project 06/30/2028 06/30/2030 B1113PJ
Enacted 2025 3760-102-6093 (1) 2805032 Budget Act $5,000,000 Preservation of Tribal Cultural Resources along Great Redwood Trail 06/30/2028 06/30/2030 B1113PJ

Projects Enacted Total: $50,000,000


Summary for PRC §94030 - Enhancement of the Natural Resource Value and Expanded Trail Access (non-motorized)

Allocation:

$100,000,000

Statewide Bond Costs:

$750,000

Enacted/Proposed Total:

$56,400,000

Outyear Commitments:

$1,699,000

Balance:

$41,151,000


Chapter 8

Park Creation and Outdoor Access

PRC §94040

Allocation: Deferred Maintenance

Net Allocation: $173,688,000


Implement projects to address the department’s backlog of deferred maintenance.


PRC §94040

Department: California State Parks

Purpose Type: Program Delivery

Chapter 8 PRC §94040
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-001-6093 (1) 2840 Budget Act $400,000 Deferred Maintenance 06/30/2026 06/30/2028 B1124PD
Proposed 2026 3790-001-6093 (1) 2840 Budget Act $400,000 Deferred Maintenance 06/30/2027 06/30/2029 B1124PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $400,000

PRC §94040

Department: California State Parks

Purpose Type: Projects

Chapter 8 PRC §94040
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-002-6093 (1) 2840 Budget Act $84,000,000 Deferred Maintenance 06/30/2028 06/30/2030 B1124PJ

Projects Enacted Total: $84,000,000


Summary for PRC §94040 - Deferred Maintenance

Allocation:

$175,000,000

Statewide Bond Costs:

$1,312,000

Enacted/Proposed Total:

$84,800,000

Outyear Commitments:

$1,325,000

Balance:

$87,563,000


Chapter 8

Park Creation and Outdoor Access

PRC §94050

Allocation: Nature Education Facilities

Net Allocation: $24,813,000


Grants may be used for buildings, equipment, structures, and exhibit galleries that present collections to promote climate, biodiversity, and cultural literacy. Projects may support species recovery and biodiversity protection in order to advance the state’s 30x30 conservation goal.


PRC §94050

Department: Secretary for Natural Resources

Purpose Type: Program Delivery

Chapter 8 PRC §94050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-001-6093 (1) 0320 Budget Act $400,000 Nature, Climate Education, and Research Facility Grants 06/30/2026 06/30/2028 B1008PD
Proposed 2026 0540-001-6093 (1) 0320 Budget Act $135,000 Nature, Climate Education, and Research Facility Grants 06/30/2027 06/30/2029 B1008PD

Program Delivery Enacted Total: $400,000

Program Delivery Proposed Total: $135,000

PRC §94050

Department: Secretary for Natural Resources

Purpose Type: Projects

Chapter 8 PRC §94050
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $10,000,000 California Academy of Sciences Natural Science Collection Digitization 06/30/2028 06/30/2030 B1008PJ
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $5,000,000 Discovery Cube 06/30/2028 06/30/2030 B1008PJ
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $1,000,000 UC Davis Integrative Center for Alternative Meat and Protein 06/30/2028 06/30/2030 B1008PJ
Enacted 2025 0540-101-6093 (1) 0320 Budget Act $1,000,000 Wolf Museum of Exploration and Innovation - Interactive Water Exhibit 06/30/2028 06/30/2030 B1008PJ
Proposed 2026 0540-101-6093 (1) 0320 Budget Act $6,198,000 Nature, Climate Education, and Research Facility Grants 06/30/2029 06/30/2031 B1008PJ

Projects Enacted Total: $17,000,000

Projects Proposed Total: $6,198,000


Summary for PRC §94050 - Nature Education Facilities

Allocation:

$25,000,000

Statewide Bond Costs:

$187,000

Enacted/Proposed Total:

$23,733,000

Outyear Commitments:

$540,000

Balance:

$540,000


Summary for Chapter 8: Park Creation and Outdoor Access

Allocation:

$700,000,000

Statewide Bond Costs:

$5,249,000

Enacted/Proposed Total:

$501,246,000

Outyear Commitments:

$15,684,000

Balance:

$177,821,000

Enacted:

$466,047,000

Proposed:

$35,199,000


Chapter 9

Clean Air

PRC §94520

Allocation: Public Financing of Clean Energy Transmission Projects

Net Allocation: $322,563,000


Public financing of clean energy transmission projects that are necessary to meet the state’s clean energy goals to reduce or offset ratepayer costs associated with the public benefits of transmission projects.


PRC §94520

Department: California Infrastructure and Economic Development Bank

Purpose Type: Projects

Chapter 9 PRC §94520
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Proposed 2026 0509-611-6093 0235028 Special Legislation $322,563,000 Public Financing of Clean Energy Transmission Projects B1050PJ

Projects Proposed Total: $322,563,000


Summary for PRC §94520 - Public Financing of Clean Energy Transmission Projects

Allocation:

$325,000,000

Statewide Bond Costs:

$2,437,000

Enacted/Proposed Total:

$322,563,000

Outyear Commitments:

$0

Balance:

$0


Chapter 9

Clean Air

PRC §94530

Allocation: Long-Duration Energy Storage Program

Net Allocation: $49,625,000


Grants or loans to support the Long-Duration Energy Storage Program. Eligible uses may also include zero-emissions distributed energy backup assets, virtual power plants, and demand side grid support.


PRC §94530

Department: Energy Resources Conservation and Development Commission

Purpose Type: Program Delivery

Chapter 9 PRC §94530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3360-002-6093 (1) 2390028 Budget Act $497,000 Long-Duration Energy Storage, Distributed Electricity Backup Assets, and Demand Side Grid Support Program 06/30/2028 06/30/2030 B1045PD
Proposed 2026 3360-002-6093 (1) 2390028 Budget Act $497,000 Long-Duration Energy Storage, Distributed Electricity Backup Assets, and Demand Side Grid Support Program 06/30/2027 06/30/2029 B1045PD

Program Delivery Enacted Total: $497,000

Program Delivery Proposed Total: $497,000

PRC §94530

Department: Energy Resources Conservation and Development Commission

Purpose Type: Projects

Chapter 9 PRC §94530
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3360-102-6093 (1) 2390028 Budget Act $33,644,000 Distributed Electricity Backup Assets Program 06/30/2028 06/30/2030 B1045PJ
Enacted 2025 3360-102-6093 (1) 2390028 Budget Act $12,500,000 Distributed Electricity Backup Assets Program - State Cost Sharing for Water Utility Projects 06/30/2028 06/30/2030 B1045PJ

Projects Enacted Total: $46,144,000


Summary for PRC §94530 - Long-Duration Energy Storage Program

Allocation:

$50,000,000

Statewide Bond Costs:

$375,000

Enacted/Proposed Total:

$47,138,000

Outyear Commitments:

$1,989,000

Balance:

$498,000


Chapter 9

Clean Air

PRC §94540

Allocation: Development of offshore wind generation

Net Allocation: $471,438,000


To support any of the following activities related to the development of offshore wind generation: (1) Construction of publicly owned port facilities for manufacturing, assembly, staging, and integration of entitlements and components for offshore wind generation. (2) Expansion and improvement of public port infrastructure to accommodate vessels involved in the installation, maintenance, and operation of offshore wind generation. (3) Upgrades to port facilities.


PRC §94540

Department: Energy Resources Conservation and Development Commission

Purpose Type: Program Delivery

Chapter 9 PRC §94540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3360-003-6093 (1) 2380010 Budget Act $2,500,000 Development of Port Facilities and Infrastructure for Offshore Wind Generation 06/30/2028 06/30/2030 B1046PD
Proposed 2026 3360-003-6093 (1) 2380010 Budget Act $2,500,000 Development of Port Facilities and Infrastructure for Offshore Wind Generation 06/30/2027 06/30/2029 B1046PD

Program Delivery Enacted Total: $2,500,000

Program Delivery Proposed Total: $2,500,000

PRC §94540

Department: Energy Resources Conservation and Development Commission

Purpose Type: Projects

Chapter 9 PRC §94540
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3360-103-6093 (1) 2380010 Budget Act $225,719,000 Development of Port Facilities and Infrastructure for Offshore Wind Generation 06/30/2028 06/30/2030 B1046PJ

Projects Enacted Total: $225,719,000


Summary for PRC §94540 - Development of offshore wind generation

Allocation:

$475,000,000

Statewide Bond Costs:

$3,562,000

Enacted/Proposed Total:

$230,719,000

Outyear Commitments:

$10,000,000

Balance:

$230,719,000


Summary for Chapter 9: Clean Air

Allocation:

$850,000,000

Statewide Bond Costs:

$6,374,000

Enacted/Proposed Total:

$600,420,000

Outyear Commitments:

$11,989,000

Balance:

$231,217,000

Enacted:

$274,860,000

Proposed:

$325,560,000


Chapter 10

Statewide Bond Costs

PRC §90135 and 95011

Allocation: Statewide bond costs shared proportionally by each program funded through this division.

Net Allocation: $75,000,000


Statewide bond costs including costs to issue bonds, fees from DOF, STO and SCO, audit costs, publishing of programs and projects to the Natural Resources Agency website.


PRC §90135 and 95011

Department: Secretary for Natural Resources

Purpose Type: Statewide Bond Costs

Chapter 10 PRC §90135 and 95011
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 0540-003-6093 (1) 0320 Budget Act $562,000 Statewide Bond Costs 06/30/2026 06/30/2028 B1009SB
Proposed 2026 0540-003-6093 (1) 0320 Budget Act $1,067,000 Statewide Bond Costs 06/30/2027 06/30/2029 B1009SB

Statewide Bond Costs Enacted Total: $562,000

Statewide Bond Costs Proposed Total: $1,067,000

PRC §90135 and 95011

Department: California State Parks

Purpose Type: Statewide Bond Costs

Chapter 10 PRC §90135 and 95011
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3790-009-6093 (1) 2840 Budget Act $1,190,000 Statewide Bond Costs 06/30/2026 06/30/2028 B1125SB
Proposed 2026 3790-009-6093 (1) 2840 Budget Act $1,415,000 Statewide Bond Costs 06/30/2027 06/30/2029 B1125SB

Statewide Bond Costs Enacted Total: $1,190,000

Statewide Bond Costs Proposed Total: $1,415,000

PRC §90135 and 95011

Department: Department of Water Resources

Purpose Type: Statewide Bond Costs

Chapter 10 PRC §90135 and 95011
Status Enactment Year Item # Budget Program/
Project Number
Source Appropriation Amount Name of Appropriation Encumbrance Date Liquidation Date Last Reappropriated by Agency Use
Enacted 2025 3860-005-6093 (1) 3230 Budget Act $246,000 Statewide Bond Costs 06/30/2026 06/30/2028 B1194SB
Proposed 2026 3860-005-6093 (1) 3230 Budget Act $251,000 Statewide Bond Costs 06/30/2027 06/30/2029 B1194SB

Statewide Bond Costs Enacted Total: $246,000

Statewide Bond Costs Proposed Total: $251,000

Summary for Chapter 10: Statewide Bond Costs

Allocation:

$75,000,000

Enacted/Proposed Total:

$4,731,000

Outyear Commitments:

$17,258,000

Balance:

$53,011,000

Enacted:

$1,998,000

Proposed:

$2,733,000


Statewide Summary:

Allocation:

$10,000,000,000

Enacted:

$3,472,915,000

Proposed:

$2,106,291,000

Outyear Commitments:

$282,408,000

Balance:

$4,138,386,000

Total Statewide Bond Cost:

$75,000,000